Published August 9, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Bedford, Texas. Completed plans call for site work for a water / sewer project.

The construction of water main improvements in Joiner Acres Addition (Russell Lane) in the City of Bedford. The water portion consists of the installation of approximately 10 linear feet of 12" AWWA DR-(18), C900 PVC water pipe, 4,341 linear feet of 8" AWWA (DR)-18, C900 PVC water pipe, and 53 linear feet of 6" AWWA (DR)-18, C900 PVC water pipe. The sewer portion includes 946 linear feet of 8" SDR 26 (PS115) PVC sanitary sewer pipe and all incidental work as indicated on the plans. Along with Bell Manor Units 1-5 and Forest Ridge No. 2 Addition in the City of Bedford. The water portion consists of the installation of approximately 10 linear feet of 20" AWWA (DR)-18, C905 PVC water pipe, 109 linear feet of 12" AWWA DR-(18), C900 PVC water pipe, 11,171 linear feet of 8" AWWA (DR)-18, C900 PVC water pipe, 866 linear feet of 6" AWWA (DR)-18, C900 PVC water pipe, 11 linear feet of 4" AWWA (DR)-18, C900 PVC water pipe. The sewer portion includes 110 linear feet of 6" SDR 26 (PS115) PVC sanitary sewer pipe by open cut, 2,448 linear feet of 8" SDR 26 (PS115) PVC sanitary sewer pipe, 28 linear feet 6" AAWA C900, (DR-18) PVC sanitary sewer pipe by open cut, and all incidental work as indicated on the plans A cashier's check or acceptable bidder's bond payable to the City of Bedford, Texas in the amount of not less than 5% of the largest possible total for the bid submitted, must accompany the bid. In the case of ambiguity or lack of clearness in the prices of the proposal, the City reserves the right to accept the most advantageous contract thereof to the City, or to reject the proposal. The City reserves the right to reject any or all bids and waive any or all informalities. No bid may be withdrawn until the expiration of ninety days (90) from the date the bids are opened. Question Deadline 07/27/2023 at 1:00 PM CT Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractors obligations under the Contract. be Substantially Complete within 360 calendar days from the date established in the Notice to Proceed. TWDB SWIFT PROGRAM NUMBER 51016 - CID 13

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

96

10

2

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
155
Bidding Soon
3,906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 7, 2023

Project location map

Multiple Locations, Bedford, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.