BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Green Bay, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Miscellaneous, Street/Road Concrete Repair, Construction, Crack Sealing Repair and/or Maintenance, Bridges/Overpasses, Maintenance, Bridge (Replacement or Rehabilitation), Concrete Repair Works Improvement Contract: "BRIDGE 1-23 (BRIDGE MAINTENANCE & CONCRETE REPAIRS)" in accordance with the plans therefore, the City of Green Bay Standard Specifications and Construction Standards for Public Works Construction, 2023 Edition, and the special provisions of this contract, all of which are on file in the City Clerk's/Treasurer's Office and the Director of Public Works Office in the Green Bay City Hall. The repair work performed under this Contract generally consists of concrete repair; crack repair; removing and replacing parapet and abutment joint sealants; deck crack sealing; timber blocking; as well as traffic control; erosion control and debris containment as necessary to complete the repairs. The work will take place on the following structures: B-5-255, N Monroe Avenue Bridge over East River; B-5-275, N Baird Creek Bridge over East River; B-5-376, East River Pedestrian Bridge; B-5-469, S Taylor Street Bridge over Beaver Dam Creek; and P-5-720, S Taylor Street Bridge over Beaver Dam Creek. The work performed under this Contract shall include furnishing all the material, labor, tools, equipment, services, methods, skills, and supervision necessary to satisfactorily complete the repair work. The work shall be let in accordance with the following Sections of the Wisconsin Statutes. 1. Section 62.15 regarding public works construction. 2. Section 779.15 regarding lien on contractors. 3. Section 66.0901(2) regarding proof of responsibility. All bidders shall provide proof of responsibility on the form furnished by the Director of Public Works and it shall be filed with the Director of Public Works not less than five (5) days prior to the time set for opening of bids. Said proof of responsibility shall not be valid if filed prior to one year of the date of opening bids. In accordance with Section 42-2 of the City of Green Bay Code of Ordinances, any corporation, firm, or individual violating Chapter 133.01 of the Wisconsin Statutes, or any subsequent Est. Completion Date: July 31, 2023

Award

Bridges / Tunnels

$126,992.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
27
Bidding Soon
459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

June 9, 2023

Project location map

Multiple Locations, Green Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.