Site work for a municipal facility in Whitesburg, Kentucky. Completed plans call for site work for a municipal facility.

This project consists of a slide around Mr. Fields house at Tan Yard Hollow Road in Letcher, County. Mr. Fields house is in imminent danger of sliding from its foundation and both the house and slide threatens access to the residences past his house and to Ky 931. This slide is located in Letcher County. To access the site from Whitesburg take Ky 931 in a northerly direction 3.88 miles to Tan Yard Hollow Road. Turn right and travel approximately 500 feet to reach the slide area on the left. The coordinates to the slide area are 3710'32.20"N, 8249'28.56"W. The Waste Area to be used is owned by the Mayking Fire Department and is an active fill site. The site is located beside US 119 in Letcher County approximately 3.4 miles south of the US 119 and Ky 15 junction in Whitesburg, Ky. The Coordinates are 378'15.80N, 8245'34.23W. The primary slide abatement planned consists of a railroad steel and guardrail lagging wall in front of the residence to prevent further damage to the residence and to protect the access of the other residents of Tan Yard Hollow Road and possible closure of Ky 931. Filter fabric and #2 stone backfill will be placed behind the wall. Mobilization is setup to provide for construction equipment to be delivered to the site. Utility Relocation/Replacement is set up in case any utility becomes impacted by the project. Traffic control is set up for road closures. Tan Yard Hollow Road will need to be closed for short periods of time to allow for material and equipment delivery. Structure Removal is setup to address the removal of a car port to facilitate access to the location. Pilot Holes are setup to determine rock line depths in areas that bedrock depths are unknown. This will allow for further determination for the length of rail steel used. Earthwork work bid item is included to excavate for the placement of the rail steel and guardrail lagging wall. A hoe ram and excavator bid item is set up to address any areas where rock or soil needs to be removed to facilitate access for the drill rig and placement of the rail steel. Residential seeding is included for all revegetation efforts within the site. Dense Grade is included to provide for access during normal reclamation. Silt barrier is set up to prevent loose material from reaching the ditch and Tan Yard Hollow Road. Any permits will be obtained prior to construction. No trees (equal to or greater than 5-inch breast height) will be disturbed outside of the winter clearing season (October 15 - March 31th), with the exception of those in the slide and transition areas. A Phase II project will follow to address the remaining slide that is impacting the property and roads below. Lump sum bids will be received from Prime Contractors for the project. All phases of work shall be bid to and through the Prime Contracting Firms. Bids shall be submitted in the manner herein described and on the official bid document form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. The lump sum bid shall include all items included on the Estimated Quantities Document. Unit Prices will be used for adjustments to the estimated quantities and contractors will be paid for the actual quantities Bids shall be submitted on the Official Form supplied by the Division of Engineering and Contract Administration. Failure to comply with the foregoing requirements will be cause for invalidation of bid. Award shall be issued on the lowest responsive bid by a responsible bidder. The Bid Document shall contain all qualifying requirements and forms. It is the intent of the Commonwealth of Kentucky to use all available funds No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the total bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. The Division of Engineering & Contract Administration, Commonwealth of Kentucky, reserves the right to reject all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served This project contains the provisions from the Davis Bacon Act. All contractors must pay the suitable amount listed on the federal wage rates for Letcher County, Kentucky. The rates are titled General Decision Number KY20230060 dated 01/06/2023

Bid Results

Municipal

$125,510.00

Public - State/Provincial

Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
11
Bidding Soon
303
All Active Projects
137
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

May 10, 2023

img_map_placeholder

Tan Yard Hollow Ln, Whitesburg, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.