BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Portage, Michigan. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

As of May 23, 2023, the project has been awarded. A timeline for construction has not been confirmed. Furnish all labor, equipment, and material required to install or remove an on-line, power conditioner and uninterruptible power system (UPS) with battery backup capability designed for transportation and traffic applications including mounting brackets, hardware, fittings, cable, connectors, grounding, and other material necessary to complete the work. The UPS shall be a microprocessor controlled and software driven power system, and be compatible for installation within traffic signal controller cabinet environments. The UPS includes an inverter which shall be in operation at all times supplying clean regulated power (both voltage and frequency) to all loads at all times, be fully power factor corrected, and fully functional with any type of auxiliary power generator. All inquiries must be made by E-mail through the electronic proposal system 0.58 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, signing, signal work, slope restoration and pavement markings on Westnedge Avenue from Melody Avenue to East Centre Avenue in the city of Portage, Kalamazoo County. This is a Local Agency project. Net classification required for this project is 896 Comb/Jt. Ea, J In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of L. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No HIPE 39000 200567A 23A0443 MI DOT - 2305 052- Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps, Signing, Signal Work, Slope Restoration and Pavement Markings on Westnedge Avenue *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$1,057,759.00

Public - State/Provincial

Paving, Site Work

32

7

6

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
744
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2023

June 19, 2023

img_map_placeholder

S Westnedge Ave, Portage, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.