Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 13, 2023 at 8:00 PM
Updated October 18, 2024
Site work and new construction of a military facility in Oak Harbor, Washington. Completed plans call for the construction of a 27,160-square-foot military facility.
This Naval Air Station - Whidbey Island (NAS-WI) facilities project includes, along with all incidental related work, the construction of a two-story, approximately 27,160 SF (Primary Facility), low rise, steel-framed, support facility of the EA-18G Aircraft FRS Training program located adjacent to the existing Hangar 12 (Building 2737) within the Flight Line Security Area at this installation. The primary site of this mission critical training, shop & office facility will provide support space for the expansion of the FRS training program along with associated mission administration space, maintenance shops, work-centers and storage for the expanded mission support. The primary site will require the construction of temporary security fencing and gates along the construction limit perimeter to create a Work Enclave area, thereby allowing direct access to the primary work site. Provide escorts for all work within the Flightline Security Area that is outside the approved Enclave area, which includes (but not limited to) utility upgrades, service connections and fire protection upgrades to the adjacent Building 2737 -Hangar 12's (East facing) facade as indicated. The secondary site of this project will provide additional parking at a nearby location that is not located inside the Flightline Security Area. With Contracting Officer's (KO) approval, this secondary site may be used as an off-premises temporary staging and laydown area for the duration of the contract. Provide temporary fencing to safeguard stored equipment and materials. Temporary Facilities: Modular Office Facility: This project also includes, along with all incidental related work, the install, hook-up and removal of a Government use (only) modular office facility.
Post-Bid
Military
$5,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2023
June 26, 2023
3730 N Charles Porter Ave, Oak Harbor, WA
Related To This Project
Oak Harbor, WA
Bid Date: Apr 19 2024
Oak Harbor, WA
Bid Date: May 16 2023
Oak Harbor, WA
Bid Date: May 09 2023
Oak Harbor, WA
Bid Date: Jun 12 2023
Oak Harbor, WA
Bid Date: Jun 06 2023
Oak Harbor, WA
Bid Date: Jun 29 2023
Oak Harbor, WA
Bid Date: Aug 01 2023
Oak Harbor, WA
--
Oak Harbor, WA
Bid Date: Mar 21 2023
Oak Harbor, WA
--
Oak Harbor, WA
Bid Date: Jan 04 2023
Oak Harbor, WA
Bid Date: Aug 18 2022
Oak Harbor, WA
--
Oak Harbor, WA
Bid Date: Aug 29 2022
Oak Harbor, WA
Bid Date: Aug 03 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed