Site work for a water / sewer project in Garden Grove, California. Completed plans call for site work for a water / sewer project.

The Anabel Woodbury Water Improvement Project consists of constructing new 8 and 12-inch PVC pipe to replace undersized 6-inch AC water mains and improve fire flows. Pipeline will be installed along Woodbury Road, Anabel Ave. Libby Ln. and Phyllis Pl. The water improvements consist of approximately 970 feet of 12-inch polyvinyl chloride (PVC) and 3,140 feet of 8-inch polyvinyl chloride (PVC) domestic water pipe. It also includes the construction of ten (10) fire hydrant assemblies and eighty two (82) water service connections. The entire project will also require reconstruction of street cross gutters, removal and abandonment of the existing water lines and valves, trenching, shoring, backfilling, compaction, dewatering, maintaining existing water services during construction, reconstructing and reconnecting of water and fire service connections, pipe disinfection and testing, traffic control, asphalt repair and replacement, traffic restriping, and installation of raised pavement markers and appurtenant work. The Engineer's estimate on this project is $1,630,850 dollars. The construction schedule will be dependent on the project start date and Woodbury Elementary School year calendar. Should the project start while school is in session construction hours are 9:00 A.M. to 2:00 P.M. Direct ANY and ALL questions to Ms. Jessica Polidori, Project Manager, (714) 741-5349. Any questions regarding this project should be directed to the Project Manager, Jessica Polidori, at (714) 741-5349.

Award

Water / Sewer

$2,097,545.00

Public - City

Site Work

11

12

2

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
588
Active Projects
293
Bidding Soon
3,998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2023

August 18, 2023

Project location map

To Be Determined, Garden Grove, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.