Demolition, site work, paving and new construction of a bridge / tunnel in Waco, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Note to Contract Us: If you are downloading this bid and anticipate responding, please email, Ken Bass, at the above information. This will give us a general idea of responding bidder(s). FINAL QUESTION SUBMITTAL DATE AND TIME: Monday, May 1, 2023, 12:00pm CST Please direct any questions to Ken Bass, Purchasing Director, (254) 759-5627 or email ken.bass@co.mclennan.tx.us. c. Responding bidder, should inspect and determine pre-existing conditions, prior to submitting a response. Submittal(s) should contain one (1) original bid response and one (1) duplicate/copy of the bid response, for a total of two (2) complete responses. The original and copy can be in the same envelope, box or container and should be clearly marked as "Original" and "Copy". Bid Withdrawal, Bid Change and Alternate Bid a. Bidders may withdraw Bid(s) at any time prior to the official opening. b. To guarantee the authenticity of the change, responding bidder, shall initial alterations made prior to bid opening date and time. c. After the official opening, bids may not be amended or altered, and may not be withdrawn without the approval of Commissioners Court. d. McLennan County reserves the right to accept or reject, in part or in whole, any bids submitted; and to waive any technicalities, informalities or defects if deemed in the best interest of the County. 2.8. Scanned or Re-typed Response: If, in its response, the responding bidder, either electronically scans, re-types, or in some way reproduces the County's published bid package, then in the event of any conflict between the terms and provisions of the County's published bid package, or any portion thereof, and the terms and provisions of the response made by the Bidder, the County's bid package as published shall control. Furthermore, if an alteration of any kind to the County's published bid package is only discovered after the contract is executed and is or in not being performed, the contract is subject to immediate cancellation. 2.9. No Commitment by McLennan County: This Invitation to Bid, does not commit McLennan County, to award any contact, or to pay any costs associated or incurred in the preparation and response to this bid, to procure or contract for the requested good(s) and/or service(s). Bid Bond(s): Bids shall be accompanied by a certified check or bid bond in the amount of five percent (5%), of the proposed price. 4.2. Performance and Payment Bond(s): Contractor, shall provide a performance bond in the amount of the bid conditioned on faithful performance of the work for the Project in accordance with the plans and specifications. Said bond shall be executed by a corporate surety or sureties duly authorized by the State of Texas to issue surety bonds. Said bond(s) shall be in the form required by Texas law, and acceptable to the Owner, and shall be payable to the Owner. Note: Performance Bond is not required if proposed amount is less than $100,000. a. Contractor shall provide a payment bond guaranteeing payment of laborers, contractors, subcontractors, and materialmen in the full amount of the GMP for the Project work. Such bond shall be executed by a corporate surety or sureties duly authorized and admitted to do business in the State of Texas to issue surety bonds. Said bond(s) shall be in the form required by Texas law, be in a form acceptable to the Owner and be payable to the Owner. If a GMP has not yet been agreed to, the bond shall be in the sum of the Project Budget. Once a GMP has been agreed to, the payment bond may be reformed to be in that amount. b. The Performance (if required) and Payment Bonds shall be provided by the Contractor to the Owner not later than the 10th day after this Agreement is executed Retainage: A five percent (5%), retainage will be held to the completion of the project if progress payments are requested for this project. a. The McLennan County Engineer, shall be the Owner's Representative and will be responsible for the final inspection and acceptance. McLennan County Engineer: Zane Dunnam Physical Address: 215 N. 5th St, Suite 130, Waco, TX. 76701 Mailing Address: P.O. Box 648, Waco, TX. 76703 Office Phone: 254. 757. 5028 4.4. Ability to begin work within thirty (30) calendar days from, notice to proceed, NTP a. Weather days, per se, will not be included in the contract. However, during periods when high river flow prevents access to the site or will not allow the contractor to safely or effectively perform work, McLennan County may temporarily stop time on the contract until such time as flow levels recede and allow work to resume. It is the contractor's responsibility to notify the County in writing of such events within 24 hours of such occurrence." b. If the work is not completed within the time stipulated, the Contractor shall pay to the County as fixed, agreed, and liquidated damages (it being impossible to determine the actual damages occasioned by the delay) the amount of ($150.00) for each calendar day of delay, until the work is completed. The Contractor and Contractor's sureties shall be liable to the County for the amount thereof. Note: We are not aware of any Covid-19 issues that would delay the completion of this project.
Award
Bridges / Tunnels
$999,800.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2023
June 5, 2023
Multiple Locations, Waco, TX
Related To This Project
Waco, TX
Bid Date: May 11 2023
Waco, TX
Bid Date: Jun 06 2023
Waco, TX
--
Waco, TX
--
Waco, TX
--
Waco, TX
Bid Date: Jun 01 2023
Waco, TX
Bid Date: May 12 2023
Waco, TX
Bid Date: Jun 22 2023
Waco, TX
Bid Date: May 30 2023
Waco, TX
--
Waco, TX
--
Waco, TX
Bid Date: May 02 2023
Waco, TX
Bid Date: Apr 26 2023
Waco, TX
Bid Date: Apr 26 2023
Waco, TX
Bid Date: Apr 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.