Published November 23, 2024 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a military facility in Colorado Springs, Colorado. Completed plans call for the construction of a 26,500-square-foot military facility; and for site work for a military facility.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The acquisition approach for this project will be a Best Value Tradeoff RFP following FAR Part 15 procedures. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 236116 is included in their profile prior to submission of offer. Site Visit: The site visit information is included within the solicitation. DO NOT submit requests for plans and specifications. See 'Obtaining Solicitation Documents' below. Project Description (approx. quantities): This project will construct a new temporary lodging facility complex consisting of three slab-on-grade, single story wood-framed buildings. One eight-unit building includes two accessible units (approx. 9,000 SF), one six-unit building contains community laundry facilities (approx. 7,200 SF), and another eight-unit building includes the main housekeeping area (approx. 10,300 SF). In addition to the eight or six dwelling units in each building, necessary functional spaces may include laundry, employee offices, staff restrooms, breakrooms, storage rooms and other utility type spaces. Each unit will contain independent HVAC systems. The project will also include internal and site-side infrastructural accommodations. Accommodations may include but are not limited to access drives, parking lots, site features & finishes, fire protection and suppression systems, HVAC systems, and interior and exterior utilities (comm, electrical, water, sanitary, etc.). The project may include bid options for furniture, furnishing and equipment (FF&E). Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility must be compatible with applicable DoD, Air Force, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. Performance and Payment Bonds will be required. The above project description is for information only. Project scope of work is subject to change. RFP Evaluation Criteria: Firms participating in the solicitation will submit technical requirements in accordance with Section 00 22 00 EVALUATION CRITERIA. Submissions will be evaluated based on a best value approach considering technical elements for evaluation (i.e., Past Performance, Technical Approach, Key Personnel, and Contract Schedule). An adjectival method of evaluation will be used to evaluate all technical factors. Price will be evaluated separately for reasonableness and realism. A Best Value selection will be considered after reviewing price and technical factors. Magnitude: The estimated construction cost of this project is between $10,000,000 and $25,000,000. Contracting Office Address: USACE Omaha District 1616 Capital Ave Omaha, NE 68102-4901 Point Of Contact: All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance). Place of Performance: Peterson Space Force Base, Colorado Obtaining Solicitation Documents: Solicitation documents will be posted to the web via SAM.gov (https://sam.gov). Find solicitation announcement in SAM.gov (https://sam.gov). Use the "Keywords" search function to locate the project (by entering the solicitation number) or use the advanced search features offered in the "Federal Organizations" (towards the middle of the page) or use the "Federal Organizations" search feature followed by the "Advanced Search" feature. By using the "Sign In" feature, it allows additional search features and allows you to keep your searches. Sign In might be required on some solicitations that are considered restricted. Once you have located your project, click on hyperlinked title of the solicitation to view the project. Files may be downloaded from the "Attachments/Links" section of the solicitation. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (https://sam.gov). Registration is required to access solicitation documents. SAM.gov (https://sam.gov) provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments. Please direct procurement questions to the Contracting Specialist, Brandon Landis via email at brandon.p.landis@usace.army.mil, add the Solicitation Number, W9128F24R0016, and Name in the Subject Line of the email. PHONE CALLS WILL NOT BE ACCEPTED. DATES ARE ESTIMATES AND SUBJECT TO CHANGE. Reservations and access must be arranged in advance preferably via email, to the proposed project site at Peterson Space Force Base, Colorado. Please limit site attendance to no more than six (6) persons per prime offering entity to include prime contractor personnel, potential subcontractors, and consultants. Site visit attendees may need to meet at a location outside the installation perimeter - precise location to be provided when arrangement for attendance are made. Bidders shall email their request to the Points of Contact below no later than close of business 08 October 2024. The bidders wishing access shall provide the following information: a. Name of contractor b. Name(s) of individual attendees c. A second identification, i.e. driver's license number and state d. Any specific components of work that are of interest to be seen during the site visit (access/availability not guaranteed) Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projenet/ no later than ten (10) calendar days before due date of proposals, in order that they may be given consideration or actions taken prior to receipt of offers. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - TDKA 07-5002 Question Deadline 11/09/2024

Post-Bid

Military

$25,000,000.00

Public - Federal

New Construction, Site Work

194

29

41

8

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Heavy Timber, Sheathing, Underlayment, Gypsum Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork, Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Metal Roof Panels, Siding, Mineral-Fiber Cement Siding, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Access Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Plaques, Interior Specialties, Partitions, Wall and Door Protection, Corner Guards, Bumper Guards, Toilet, Bath, and Laundry Accessories, Fireplaces and Stoves, Storage Specialties, Lockers, Exterior Specialties, Exterior Protection, Protective Covers, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Residential Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furnishing Accessories, Bowls, Rugs and Mats, Runners, Furniture, Seating, Chairs, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Purpose Rooms, Special Activity Rooms, Saunas, Integrated Construction, Radiation Protection
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Breechings, Chimneys, and Stacks, Furnaces, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Radiators, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Mowing, Pruning, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Drip Irrigation, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Site Grounding, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Hooks, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
31
Bidding Soon
588
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

January 21, 2025

img_map_placeholder

Suffolk St, Colorado Springs, CO

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construct Temporary Lodging Facility, Peterson Spaceforcebase, Colorado

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.