BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2023 at 8:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Arnold, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Description and Location of the Project is as Follows: for Construction and Reestablishment of Existing Slopes With Grs Slope Stabilization and Rock Stabilization, Bituminous Pavement, Drainage, Guiderail, Pavement Marking, and Other Miscellaneous Construction, All Within a Length of 3,827.50 Linear Feet (0.725 Miles) as Indicated on the Approved Drawings Included in the Bid Package for State Route 2084, Section A03 (Milltown Road), in Allegheny County, Plum Borough, Commonwealth of Pennsylvania. The Project Being Situated as Follows: From a Point Approximately 475 Feet Northeast of Barnes Road at Segment 0030 Offset 0891 (Station 63+75.00) to a Point Approximately 70 Feet South of Shearer Road at Segment 0040 Offset 2932 (Station 103+50.00). Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Slides Correction PennDOT - SR 2084, Milltown Road Slide *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,175,905.00

Public - State/Provincial

Paving, Site Work

56

11

26

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
166
Bidding Soon
1,343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2023

June 26, 2023

Project location map

Milltown Rd, Arnold, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.