BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2024 at 8:00 PM

Updated October 8, 2024

Site work for a water / sewer project in Shiloh, Georgia. Completed plans call for site work for a water / sewer project.

**As of June 28, 2023 project was awarded to John R. Walker, Inc., awarded amount is $1,130,186.40.** The work to be completed shall consist of furnishing all labor, equipment and materials necessary to install approximately +-6,200 L.F. of 6" PVC water main complete with fire hydrants, valves, earthwork, grassing, soil erosion and sediment control, measures, and appurtenances necessary to provide a complete installation. Time allotted for completion of work is 150 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days.

Award

Water / Sewer

$1,130,186.00

Public - City

Site Work

12

7

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
93
Bidding Soon
1,276
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

June 16, 2023

Project location map

Multiple Locations, Shiloh, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.