BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Minneapolis, Minnesota. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work of this project includes: The Work will be located on Metro Transit controlled property. 1. Bridge 9360, Washington Avenue Green Line LRT over West River Parkway, Mississippi River, and East River Parkway in Minneapolis, MN. 2. Bridge 9472A, University Avenue Green Line LRT over TH 280 in St Paul, MN. 3. Bridge 62889A, Cedar Street Green Line LRT over TH 35E & TH 94 in St Paul, MN. The project includes maintenance repairs for bridges on the METRO Green Line LRT systems. The Work for this Project includes, but is not limited to the following: 1. At Bridge 9360 Washington Ave, the CONTRACTOR will clean the LRT guideway deck, guideway approach panels, and expansion joints utilizing high pressure water and collecting and disposing of all residues, seal cracks, and apply concrete protective sealant. a. CONTRACTOR will have access to the Metro Transit hi-rail vac truck for cleaning. b. CONTRACTOR will flush drains. 2. At Bridge 9472A 280, the CONTRACTOR will: a. Remove and replace the bridge transverse and longitudinal compression joints with a watertight pre-compressed foam-supported silicone bridge joint system. b. Renovate and install an existing salvaged median curb cover plate. c. Clean pigeon debris from the two abutment bearing seats and pier caps of the LRT guideway and provide bird repellent spikes on the cleaned surfaces. 3. At Bridge 62889A Cedar St., the CONTRACTOR will clean the LRT guideway deck, guideway approach panels, and expansion joints utilizing high pressure water and collecting and disposing of all residues, seal cracks, and apply concrete protective sealant. 4. The CONTRACTOR will supply the necessary traffic control and obtain permitting from , Hennepin County, City of Minneapolis, City of St. Paul, Metro Transit, and any other permitting organizations. 5. Hours of construction for work below the deck will be defined by traffic control permit restrictions. 6. Above deck construction will be performed under active LRT operations and traffic control. There will be one rail and bridge extended weekend nighttime shutdown. 7. The CONTRACTOR will supply the ITL for all material testing. 8. CONTRACTOR will need rail insurance and On-Line Metro Transit Rail Safety Certification.

Award

Bridges / Tunnels

$284,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
790
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2023

June 12, 2023

img_map_placeholder

Multiple Locations, Minneapolis, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.