Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a warehouse / distribution facility in Springfield, Missouri. Completed plans call for the renovation of a warehouse / distribution facility.
Scope: The Work consists of installing a solar array, replacing building lighting with all LED fixtures, and replacing metal roof, downspouts & gutters at the Missouri National Guard's Springfield Field Maintenance Shop (FMS). NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. C. **NOTE: Bidders are provided new Good Faith Effort (GFE) forms on MissouriBUYS. D. In addition to the State of Missouri MBE/WBE/SDVE participation goals set forth herein and in the bid documents for this project, the contractor on a federally funded/assisted construction project is subject to federal Executive Order 11246. The Bidder's attention is drawn to the Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity (Executive Order 11246, 41 C.F.R. 60- 4.2) in Section 007333, SUPPLEMENTARY GENERAL CONDITIONS FOR FEDERALLY FUNDED/ASSISTED CONSTRUCTION PROJECTS, which is incorporated by reference. NOTE: Prime contractors will be allowed a maximum of two bid sets at the deposit rate shown above. Other requesters will be allowed only one bid set at this rate. Additional bid sets or parts thereof may be obtained by any bidder at the cost of printing and shipping by request to American Document Solutions at the address shown above. Bidder must secure at least one bid set to become a planholder. B. Refunds:Return plans and specifications in unmarked condition within 15 working days of bid opening to American Document Solutions, 1400 Forum Blvd., Suite 7A, Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433. Deposits for plans not returned within 15 working days shall be forfeited. POINT OF CONTACT: A. Designer: GHN Architects + Engineers, David Frohling, AIA, (417) 869-0719 Ext 235, email: df@ghnae.com B. Project Manager: Eric Hibdon, PE, (573) 522-0322, email: Eric.Hibdon@oa.mo.gov . The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications SDVE 3%
Award
Warehouse / Distribution
$382,500.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 25, 2023
June 26, 2023
To Be Determined, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Jun 14 2023
Springfield, MO
Bid Date: Apr 27 2023
Springfield, MO
Bid Date: Aug 29 2023
Springfield, MO
--
Springfield, MO
Bid Date: Apr 20 2023
Springfield, MO
Bid Date: May 23 2023
Springfield, MO
Bid Date: Apr 24 2023
Springfield, MO
Bid Date: Apr 19 2023
Springfield, MO
Bid Date: Apr 27 2023
Springfield, MO
Bid Date: Apr 20 2023
Springfield, MO
Bid Date: May 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.