BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Renovation of a municipal facility in Anaheim, California. Conceptual plans call for the renovation of a municipal facility.

UPDATE : This project will replace and automate the chillers and cooling towers in the Anaheim Convention Center (ACC) that are over 40 years old and have outlived their useful lives. The project will also add variable speed drives and automation to chiller plants to improve collection of performance data and flexibility in managing power used. The cost of further maintaining the chillers and cooling towers is no longer economical due to their age and obsolescence. Replacing them with equipment that is adaptive to new technology and energy efficiency will deliver savings on utility costs. The replacement of old ozone depleting refrigerant systems to new green technologies also positions the ACC in line with the global effort to reduce global warming supporting our facility goals for LEED compliance. Cooling tower A was installed in 1968 and requires continuous costly repairs due to it being made of wood. The system is also a high-volume consumer of utilities. The upgrade would increase performance and efficiency. Project is in City of Anaheim capital budget fy 2025-2026 CIP ______________________________________________________________________________________ This project will replace and automate the chillers and cooling towers in the Anaheim Convention Center (ACC) that are over 40 years old. The project will also add variable speed drives and automation to chiller plants to improve collection of performance data and flexibility in managing power used. Replacing the chillers and cooling towers with equipment that is adaptive to new technology and energy efficient will deliver savings on utility costs. The replacement of old ozone depleting refrigerant systems to new green technologies also supports our facility goals for LEED compliance. Project is included in the City of Anaheim's FY 2024-2028 CIP. As of July 1, 2024, information regarding a design team and a general contractor is not available. Funding is anticipated from 2024 to 2028.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$3,066,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
631
Active Projects
182
Bidding Soon
4,020
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.