Demolition, site work and asbestos abatement for a mixed-use development in Clearlake, California. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; for asbestos abatement for a municipal facility; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Questions regarding the Contract Documents, requests for interpretations or clarifications, either administrative or technical, may be submitted through the e-Procurement Portal via the Q&A tab by 5:00 pm on Wednesday, May 3, 2023. The Contractor will provide all supervision, labor, equipment, supplies and materials for: o At time of mandatory pre-bid meeting, the City will provide asbestos and lead reports, if applicable. In such cases of existence, contractor is responsible for the removal, transportation and disposal of all hazardous waste materials. o The removal, transport, and disposal of all structures. o Disposal of all structures includes, but is not limited to, foundation, slab, walkways, walls, subflooring and roofing. o Removal and disposal of, but not limited to, all trash, junk, debris, appliances, furniture, tires from property. o Entire earth surface of parcel shall be graded smooth and free of dry / dead vegetation. Land must be left in a condition that prevents erosion and run off of water and soil onto adjacent properties, the public right of way and roadway. o All underground utilities, re: water and sewer or septic main, shall be staked and marked at time of completion. Prior to beginning demolition, the Contractor shall install construction site Best Management Practices (BMPs) that effectively protect all drainage facilities, watercourses, and water bodies from discharges of pollutants, including sediment. All BMPs shall be designed, manufactured, and installed in accordance with the California Stormwater Quality Association's Stormwater Best Management Practice Handbook - Construction. All waste bins and material or debris stockpiles that are not removed from the site at the end of each working day shall be covered and provided with secondary containment. Call the City Engineer at (707) 994-8201, ext. 116 for further information. Contractor is responsible for disconnection of all utilities, including sewer, electrical, water, phone and cable. USA ticket to be pulled prior to commencement of work. Please contact all utility agencies before disconnecting or capping on ALL properties. Demolition of Building(s) and property abatement(s) at the following location(s): 3191 6th Street, 3662 Cottonwood Street, 16272 32nd Avenue, 14870 Clement Drive, 3556 Madrone Street, 14081 Woodland Drive, 3628 Johnson Avenue, in the City of Clearlake, Engineer's Estimate: $115,000.00

Award

Roads / Highways

$113,800.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
55
Bidding Soon
889
All Active Projects
377
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

July 10, 2023

img_map_placeholder

Multiple Locations, Clearlake, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.