Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 19, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a road / highway in Blair, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The work for this project is Asphalt overlay on several roadway surfaces within Washington County, Washington County,Nebraska. Approximate Asphalt Tonnage = 5,100 Tons. All Bids for the said construction work must be made on blank forms furnished by the Engineer and shall be accompanied by a Bid Security or Certified Check,the amount of which is not less than Five (5) percent of the bid price. Bid Security shall be made payable to the Treasurer of Washington County, Nebraska, and will be held by the clerk as liquidated damages in the case the bid is accepted and the Bidder neglects, or refuses, to enter into contract and furnish bonds in accordance herewith. Bid Security shall be sealed in a separate envelope from the Bid and labeled on the outside "Bid Security". No bidder may withdraw his/her bid for a period of thirty (30) days after the date Street set for the opening of Bids. The Contractor, whose Bid is accepted by Washington County Nebraska, will be required to furnish a Performance, Payment and Maintenance Bond in a sum equal to one-hundred (100) percent of the contract price, for a period of two years past the completion of the project The Board of Supervisors of Washington County, Nebraska reserves the right to reject any or all Bids and to waive informalities and technicalities, and to enter into such Contract as it may deem to be for their best interest. The Board of Supervisors of Washington County, Nebraska also reserves the right to eliminate OR add County Road miles from/ to the project based on budgetary constraints. A final decision on the total amount of asphalt work to be completed will be made after Bids have been received, publicly opened, and reviewed by Washington County. The Contractor shall complete the Asphalt Base Repair and Overlay 2023 by June 30, 2023. Liquidated Damages of five hundred ($500) per working day will be assessed after the time for completion has expired.
Award
Roads / Highways
$832,311.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2023
June 23, 2023
Multiple Locations, Blair, NE
Related To This Project
Blair, NE
Bid Date: May 09 2023
Blair, NE
Bid Date: May 23 2023
Blair, NE
Bid Date: Jun 06 2023
Blair, NE
Bid Date: May 23 2023
Blair, NE
Bid Date: May 23 2023
Blair, NE
Bid Date: Jun 15 2023
Blair, NE
Bid Date: Feb 22 2024
Blair, NE
Bid Date: Mar 16 2023
Blair, NE
Bid Date: Apr 19 2023
Blair, NE
Bid Date: Mar 29 2023
Blair, NE
Bid Date: Mar 15 2023
Blair, NE
Bid Date: Sep 29 2022
Blair, NE
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.