BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 29, 2024 at 7:00 PM

Updated July 10, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Blair, Nebraska. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

The City of Blair is accepting sealed bid for the construction of Blair Generations Park, NPS 31-01089. The work consists of all construction indicated on the drawings and specifications, included but not limited to the following. A new park restroom, amphitheater, splash pad, playground, pickle-ball courts, basketball court, sidewalks, parking lot, and site lighting. All required site, framing, finishing, plumbing, mechanical, and electrical work shall be included under this contract. Federal funds will be used to assist with the development to this project. Envelopes containing the bids shall be sealed and must be accompanied by a certified check or bid security in the amount of five percent of the total bid amount. Said check or bid security shall be made payable to the City of Blair, Nebraska and shall be forfeited to the city in the event the bidder to whom an award is made refuses or fails to enter unto an agreement, as required by the specifications, within ten calendar days after being notified of such an award. The City Council reserves the right to reject any and/or all bid and to wave informalities and irregularities and to make awards on bids which furnish the materials and construction that will, in their opinion, serve the best interests of the City of Blair, Nebraska. PLANS AVAILABLE: ieo.com/bidding Contact: Jenny Cyboron Phone: 402.742.7215 Email: jlcyboron@jeo.com For plans and specifications that are to be shipped 1. Include a non-refundable $15.00 shipping and handling fee for each set of plans and specifications. 2. Submit the fee as a separate check. Project Description: The 7.5-acre park project shall consist of a new park restroom, amphitheater, splash pad, pickle-ball courts, basketball court, sidewalks, parking, and site lighting. All required site, framing, finishing, plumbing, mechanical, and electrical work shall be included under this contract. Federal funds will be used to assist with the development of this project-NPS# 31-01089. Bids will be received at the City Council Chambers, 218 16th Street, Blair, NE 68008. Bids will be opened publicly. Direct questions to Eric Casper with JEO Architecture, Inc., telephone; 402.326.8866, email: ecasper@jeo.com.

Award

Playgrounds / Parks / Athletic Fields

$2,223,800.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

25

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
95
Bidding Soon
996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

April 24, 2024

Project location map

2233 Civic Dr, Blair, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.