Published May 4, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Waterloo, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The extent of the work involved is the construction of street improvements in, along and upon portions of certain streets, avenues, roads, and alleys, and such other work as may be incidental thereto along and upon the following streets, avenues, roads and alleys. Street improvements consisting of: Division I - E. San Marnan Dr. Reconstruction 9" P.C.C. pavement section with 10" subbase material Division II - E. San Marnan Dr. Water Main Relocation Division consisting of filling, abandoning, and relocating a 16" Water Main. 9" P.C.C. pavement section with 10" subbase material Subgrade drain tile, granular subbase, new storm sewer and appurtenances and other such work as may be incidental thereto. All street improvements consist of the reconstruction of an existing paved street, which is to be replaced with a proposed street The work under the proposed contract shall be commenced within ten (10) working days after receipt of "Notice to Proceed" and all items shall be completed on or before December 1, 2023. A contract will be awarded to the qualified bidder submitting the lowest bid. The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-five percent (95%) of the work as it is completed and materials delivered and work approved. Final payment will be made thirty-one (31) days after completion of the work and acceptance by the Counc Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, the contractor shall pay to the City Liquidated Damages in the amount of one thousand dollars ($1,000.00) per day, for each day, as further described herein, in excess of the authorized time The City reserves the right to reject any or all bids, re-advertise for new bids, and to waive informalities in the bids submitted that might be in the best interest of the City A goal of at least ten percent (10%) for MBE participation on all City funded construction projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%) for WBE participation on all City funded construction projects that are estimated at $50,000.00 or more. Any project funded in part or in total with federal funds shall follow the respective agencies contract compliance program and goals. Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide the Prime Contractor a reasonably competitive price for the service being rendered or the Contractor is not required to accept their bid. The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in numerals on the blanks provided. Should there be any discrepancy between the unit bid price and extension, the City of Waterloo shall consider the unit bid price as being the valid unit bid price.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

33

7

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
121
Bidding Soon
1,432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

June 5, 2023

Project location map

E San Marnan Dr, Waterloo, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.