BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Waterloo, Iowa. Completed plans call for site work for a water / sewer project.

The extent of the work involved includes a directionally drilled 8-inch diameter PVC water main approximately 1,480 feet long in the City of Waterloo, Iowa in public road right of way from the West end of Sager Ave. to approximately 340 feet East of Progress Ave., plus approximately 1,450 feet of conventionally laid 8-inch dia. PVC water main in the City of Cedar Falls, in a private easement in un platted property west of Heartland Hills Second Addition from the West end of Matthew Dr. to the West end ofJill Dr. to the West end of Mark Dr. to the West end of Jodi Dr. to the West end of Sager Ave. plus water services and appurtenances to replace existing water mains and to construct new water mains. The successful Bidder shall be required to furnish corporate surety bonds in an amount equal to 100% ofits contract price, said bonds to be issued by a responsible surety approved by the Board of Trustees, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the Board of Trustees from claims and damages of any kind caused by the operation of the contractor and shall also guarantee the maintenance of the improvements in good repair for a period oftwo (2) years from and after the completion and acceptance by the Board of Trustees. Each proposal shall be accompanied in a separate envelope by either cash, a certified check drawn on a solvent state, or national bank; or a bid bond, in the form set out in the Specifications, executed by a corporation authorized to contract as a surety in the State of Iowa in the amount equal to five percent (5%) of the amount of the proposal, made payable to the of the Treasurer of the Waterloo Water Works Board of Trustees of Waterloo, Iowa. Time is an essential element ofthis contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, the contractor shall pay to the Waterloo Water Works Liquidated Damages in the amount offive hundred dollars ($500.00) per day, for each day, as further described herein, in excess of the authorized time.

Post-Bid

Water / Sewer

$535,000.00

Public - City

Site Work

21

7

14

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
49
Bidding Soon
654
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

June 8, 2023

img_map_placeholder

Multiple Locations, Waterloo, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.