Renovation of a museum in Suitland, Maryland. Completed plans call for the renovation of a three-story above grade museum.

Contract Award Date: Aug 25, 2023 Contract Award Number: 33330223CF0010447 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: UK98FPGUAKM1 Contractor Awarded Name: SPACESAVER SYSTEMS, INC. Contractor Awarded Address: Bethesda, MD 20814 USA Base and All Options Value (Total Contract Value): $1,066,420.00 The Smithsonian Institution is seeking offers to furnish and install Collections Storage Equipment for Pod 6, located at the Smithsonian Institution's Museum Support Center, 4210 Silver Hill Road, Suitland, Maryland 20746, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1630102 both dated January 13, 2022, and January 11, 2023, respectively. Offerors are required to demonstrate satisfaction of the minimum qualifications for this contract set forth in Section L below in order to be considered for this award. Submission instructions and requirements are set forth in Section L. Evaluation factors for qualifying offerors are set forth in Section M below. Upon the receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a fixed price construction contract. The Smithsonian currently estimates the Project Magnitude to be over $10M. The Period of Performance for the Contract is 664 calendar days from the Notice to Proceed. It shall be the responsibility of the contractor to immediately notify the Smithsonian Institution, if the target dates and proposed packages of work described herein adversely affect the Contractor's Critical Path Schedule (also refer to throughout this RFP as the Progress Schedule) for the final completion date of this project. Contractors may propose an alternate schedule which illustrates the completion of the project in advance of the completion date, for review by Smithsonian in accordance with the terms of the contract. This Request for Proposal (RFP) is intended to provide all Offerors with sufficient information to enable them to prepare and submit offers for technical and cost review and consideration by the Smithsonian Institution. This solicitation neither commits the Smithsonian Institution to pay any proposal preparation costs nor obligates the Smithsonian to procure or contract for construction or any other services. It shall not be construed as authorization to proceed with or be reimbursed for any of the costs for any of the work specified herein. The Smithsonian may cancel this RFP without prior notice. PROJECT DESCRIPTION Background The Smithsonian Institution's (SI) collections storage presence at the Suitland Collections Center (SCC) began in 1952. In 1983 the Museum Support Center (MSC) was added and consisted of four storage pods. Pod 5 was added at the east end of the MSC in 2007. The MSC also provided a circulation spine, referred to as the "Street", research labs, office space, a central utility plant, a loading dock and other support spaces. In 2011, SI began a detailed project with Ayers Saint Gross to identify and strategically address the pan- Institutional collections space needs throughout their 2.1 million square feet of collections space at more than 35 properties. In 2014, the Collections Space Framework Plan (CSFP) was issued as a planning initiative that holistically looks at the Smithsonian's collections space, future needs and management strategies to ensure its collections are preserved and remain accessible for current and future generations. Consequently, in looking to expand their investment and to plan for growth more holistically, SI commissioned the Suitland Collections Center Master Plan. Recently completed in 2020 the Master Plan incorporated redeveloping SCC and included the addition of Pod 6 on the west side of the existing MSC facility. The construction of the three-story Pod 6 will allow SI to house collections from the Hirshhorn Museum (HMSG), the National Museum of Natural History (NMNH), National Museum of American History (NMAH) and National Postal Museum (NPM) with the goal of relocating collections at high risk due to the condition of existing space and preserve existing adjacencies at MSC while reducing the number of off-site storage locations. Summary of Work As set forth in the Drawings and Specifications included herewith, the work includes, but is not limited to (i) Early fabrication & delivery of high density mobile storage system rails and rail covers for concurrent installation with General Contractor concrete pour. Material to be onsite in coordination with General Contractor's concrete placement schedule currently scheduled for September 1, 2023. Fabrication, delivery, and installation of pallet racks, high density mobile storage systems, and museum storage cabinets. Critical Elements of the Work: The successful Contractor shall be fully qualified to install critical elements of the Work. Critical elements of the Work are as follows: High Density Mobile Storage Systems Pallet Racks Museum Storage Cabinets

Award

Museum

$1,066,420.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
211
Bidding Soon
3,285
All Active Projects
1,301
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 7, 2023

September 7, 2023

July 2, 2025

img_map_placeholder

4210 Silver Hill Rd, Suitland, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.