EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a mixed-use development in Hammond, Indiana. Completed plans call for the construction of a residential development; for site work for a residential development; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This work shall include, but is not limited to, the construction of 37-lot, single family residential subdivision. Work includes demolition of above ground features and underground utilities. Storm sewer, sanitary sewer, water main along with connection to existing for each. Site grading, asphalt streets with curb and gutter. Sidewalk and landscape berm. Erosion control measures. in the City of Hammond, Lake County, Indiana. This work shall be completed by November 15, 2023. Bid documents will be available. Electronic contract documents can be obtained online from Abonmarche website, found at http://www.abonmarche.com/bids. There is no fee for registration on the plan holder's list and download of electronic bidding documents. Hard copies are available from ABONMARCHE CONSULTANT'S, INC., 17 N. Washington Street, Valparaiso, IN 46383. 219- 850-4624. The fee for obtaining a hard copy documents is Fifty Dollars. An additional Ten Dollars will be charged for plans requiring shipping. General Specifications, description and conditions upon which the bid proposal is to be based are on file for examination at the office of the Engineer, Abonmarche Consultants, Inc. All Bidders must be properly licensed in the City of Hammond at the time bids are received. Contractors may contact the Hammond Building Inspections Department to inquire on General Contractor and Sub- contractors licensing and requirements, at 219.853.6316 or the Hammond website, www.gohammond.com Inspections Department for applications. Please note that the Hammond Contracting Board only meets once per month, at the first Monday of every month at 6:00 pm in the Inspection Department Conference Room. The deadline for submitting an application and required information for a Hammond License is one week prior to the meeting. For this bid, the next deadline to submit an application is April 24, 2023 and then corresponding meeting date is May 1, 2023. All Bidders must comply with Hammond Ordinance No. 9519 related to Responsible Bidding Practices that requires all Bidders to become prequalified by the City of Hammond Building Commissioner prior to submitting a Bid for Public Works for the City of Hammond. A copy of the ordinance is contained in the Contract Documents, Section 00 75 55. Contact the Hammond Building Department for more details at (219) 853-6317 No bidder may withdraw his proposal for a period of 60 days following the date set for receiving bids. The Hammond Redevelopment Commission reserves the right to retain any and all bids for a period of not more than 60 days, and said bids shall remain in full force and effect during said time. The Hammond Redevelopment Commission further reserves the right to waive informalities and toward the contract to any Bidder all to the advantage of the Hammond Redevelopment Commission or to reject all bids. Each bid shall be accompanied by an acceptable certified check or cashier's check made payable to the Hammond Board of Public Works and Safety or an acceptable Bid Bond in an amount not less than five percent of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana. A performance bond and payment bond each in the amount of one hundred percent of the contract price will be required. Standard Indiana Form 96 (Revised 2013) which includes non-collusion affidavit will be required. Contractors submitting a bid for City construction projects must subscribe to the Indiana Plan and a joint apprenticeship and training program for that project if their bid is accepted and provide proof of same before any payments are made. Each bidder must ensure that all employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin and each bidder must conform with the anti- discrimination provisions of IC 5-16-6. An Affirmative Action Statement must be submitted at time of bid.

Post-Bid

Residential Subdivision

$4,453,000.00

Public - City

Demolition, New Construction, Paving, Site Work

51

18

35

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Membrane Roofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs, Multiple Seating, Pews and Benches, Benches
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Plastic Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
109
Bidding Soon
2,115
All Active Projects
867
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

July 3, 2023

img_map_placeholder

To Be Determined, Hammond, IN

Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Clark Fields Second Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.