EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in River Grove, Illinois. Completed plans call for the renovation of a educational facility.

A. The contractor is notified that Allowances are included in this project. See Section 01 21 00 - Allowances. This project consists of an interior remodeling of a first floor area of approximately 7,500 SF in Building A on the Triton College campus in River Grove, IL to convert an existing large computer lab and support areas to a new staff tutoring and support area. Included is demolition and disposal of the following existing items: o Acoustical lay-in ceiling system o Ceiling mounted light fixtures o Mechanical, plumbing, & electrical systems o Floor mounted book scanners o Saw-cutting & removing existing concrete floor slabs on grade o Interior doors & windows o Wall partitions o Carpeting New construction includes furnishing & installing the following items: o New acoustical lay-in ceiling system o New gypsum board soffits o New lighting o New carpet tiles o Concrete floor slab on grade infill o New interior doors & hardware o Paint o New mechanical, plumbing, & electrical systems There is an Alternate to furnish and install moisture mitigation on all existing concrete floor slabs receiving new flooring. The Contractor shall supply all labor, transportation, apparatus, scaffolding, and any tools necessary for the completion of the work, maintain and remove temporary equipment, and construct in excellent and workmanlike manner the complete work and everything properly incidental thereto as stated in the contract documents or reasonably implied therefrom. It is not the intent of the contract documents to set forth in detail every item necessary for the construction of this project. Contractor must be qualified for this work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order ready for use without additional work. All parts must be coordinated, complete, ready to operate and delivered to the Owner in new condition. Each Contractor shall coordinate his work with any and all other trades and Contractors on the site. His work shall be performed in a timely fashion to meet the project time schedule for all work. Questions, Please Contact Arcon Associates, Inc. - Mr. Gaspare Pitrello (630) 495-1900 Ext. 210 or Email Gppitrello@arconassoc.com

Award

Educational

$490,150.00

Public - City

Renovation

17

14

10

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Administrative Requirements, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Door Louvers
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Terrazzo Flooring, Carpeting, Tile Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
109
Bidding Soon
2,206
All Active Projects
805
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

June 14, 2023

img_map_placeholder

2000 5th Ave, River Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.