Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Northfield, Massachusetts. Completed plans call for the renovation of a educational facility.

Renovate existing toilet rooms to include new fixtures and finishes and improve MAAB compliance. Work includes demolition, masonry, framing and drywall, ceramic tile, painting, acoustic ceilings, toilet partitions and accessories, Plumbing, HVAC and Electric. This Section lists the Alternates which appear in the Contract Documents. Consult the individual sections of the detailed requirements of each Alternate. B. Bid prices for each Alternate shall include overhead, profit, and all other expenses incidental to the Work under each Alternate. C. The Contractor and Subcontractors shall be responsible for examining the scope of each Alternate generally defined herein and for recognizing modifications to the Work caused by the Alternates and including the cost thereof in the bid price. D. The Contractor's alternate amount shall include the net change in cost to perform all of the work described in the Alternate. A. All of the Contract Documents, including General and Supplementary conditions and Division 0 - Bidding Documents, Contract Forms and Conditions of the Contract and Division 1 - General Requirements, apply to the work in this Section. B. Carefully examine all the Contract Documents for requirements which affect the work of this Section. The exact scope of this Section cannot be determined without a thorough review of all specification sections and other Contract Documents. C. Where referred to, Standard Specifications, Recommendations of Technical Societies, and/or Manufacturer's Associations, plus Codes of Federal, State, and Local Agencies shall include all amendments current as of date of issue of these specifications. The Project consists of but not limited to: Renovate existing toilet rooms to include new fixtures and finishes and improve MAAB compliance. Work includes demolition, masonry, framing and drywall, ceramic tile, painting, acoustic ceilings, toilet partitions and accessories, Plumbing, HVAC and Electric. Bid Result Plumbing : Adams Plumbing & Heating, Inc - $83,150.00 Heating, Ventilating and Air Conditioning (HVAC) : Adams Plumbing & Heating, Inc - $55,850.00 Electrical Work : Collins Electric Co., Inc. - $10,567.00

Bid Results

Educational

$149,567.00

Public - City

Renovation

12

19

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
890
Active Projects
418
Bidding Soon
5,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

June 5, 2023

Project location map

104 Main St, Northfield, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed