Site work for a laboratory facility in Batavia, Illinois. Completed plans call for site work for a laboratory facility.
Fermi Research Alliance, LLC (FRA) is seeking a sub-contractor to Install Concrete Footings for Tumbler - Village Lab 2 at Fermi National Accelerator Laboratory located in Batavia, IL. The Subcontractor's compensation for services rendered shall be based on a fixed firm price for the work detailed in the scope of wor. Please reference the scope of work, that is included in the RFP for specific details. This acquisition is being advertised as a 100% small business set-aside. The NAICS Code for this procurement is 238110 Poured Concrete Foundation and Structure Contractors , Size Standards $16.5M. In accordance with FAR 36.204, the magnitude of construction is between $25,000 and $100,000. FRA intends to award to the lowest priced, technically acceptable All questions must be submitted in writing to ggomez@fnal.gov no later than Friday May 5, 2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Provide labor, materials, equipment, and supervision to perform the following concrete construction efforts. 1. Floor surface to be free of materials and broom swept. 2. Post barricades, caution tape and warning signs to completely secure work area from employees and other personnel. 3. Per approved Fermilab excavation permit, lay out floor per drawing "Lab 2 Floor Layout with Tumbler Footings" at east end of High Bay space. 4. Using wet saw operations, saw cut existing floor slab creating (6) 2' x 3' slab sections to be removed. 5. Remove slab sections of concrete and properly dispose of offsite. 6. Per drawing "Lab 2 Tumbler Footing Assembly", excavate areas to depth shown. Spoils to remain on site. APSTD/CC to provide location for dumping. 7. Install re-bar per drawing "Lab 2 Tumbler Footing Assembly". 8. Install (1) 1" x 10'L Copper ground rod (provided) in SW excavation, SW corner. Leave approx. 6" of ground rod above existing slab elevation. Below grade, connect ground rod to re-bar assembly by means of Copper C tap connector (provided). 9. Install expansion board material at exposed slab sections. 10.Pour and finish concrete. Finish smooth. Fill all over cut saw kerfs with concrete. 11.After 28-day cure time, using a dust free method prepare surface area of new footings and adjacent areas by grinding smooth. Fill any cracks, pits, or holes with epoxy-based filler compound. Sand patched surfaces smooth. 12.Apply 100% solids based pigmented latex-based epoxy primer to new footing areas. Primer shall be 8 mil thick and must create a barrier with a MVT rating of 15-17lb per 1000 sq. ft. 13.Apply a 100% solids latex-based epoxy system. Apply (2) coats of epoxy to achieve a thickness of ~ 12 mils. Color and finish shall match existing floor conditions.14. Clean up work area and dispose of debris as assigned by APSTD/CC. NOTES: o Contractor to confirm all dimensions. o Submit for approval latex-based epoxy floor coating products. o Submit Safety Data sheets for all materials to be used on project for review and approval. o Normal working hours shall be M-F, 7:00 am - 4:30 pm. Some flexibility can be given dependent on the activity for the day(s).
Post-Bid
Laboratories
$100,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2023
June 12, 2023
To Be Determined, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: May 17 2023
Batavia, IL
Bid Date: May 17 2023
Batavia, IL
--
Batavia, IL
Bid Date: Dec 01 2021
Batavia, IL
Bid Date: May 25 2023
Batavia, IL
Bid Date: Jun 07 2023
Batavia, IL
Bid Date: Jun 01 2023
Batavia, IL
Bid Date: May 03 2023
Batavia, IL
Bid Date: Apr 18 2023
Batavia, IL
Bid Date: Apr 18 2023
Batavia, IL
Bid Date: Apr 18 2023
Batavia, IL
Bid Date: Apr 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.