BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2024 at 7:00 PM

Updated October 28, 2025

Renovation of a water / sewer project in Brentwood, Tennessee. Conceptual plans call for the renovation of a water / sewer project.

Update:https://www.brentwoodtn.gov/home/showpublisheddocument/7480/638632468738330000 This project provides for an on-going program to rehabilitate the City's sewer lift stations including operating equipment that provides alternative pumping methods during an emergency. FY 2024 funding includes continued engineering and bidding of the Arden Woods and Scales School sewer lift stations project. The project scope includes abandoning the Arden Wood's sewer pump station and extending a gravity sewer line from that location to the Scale's School sewer pump station. The Scales School station will then be upsized per the Sewer System Master Plan recommendation to accommodate future basin growth. This project was delayed this year as staff were assessing if this project would be a candidate for State distributed ARP funds. However, the City received a TDEC determination that the ARP grant funds may be applied to an alternative project and therefore, this project is now planned to be let in April, 2024, with the majority of construction taking place in FY 2025. A preliminary assessment of the Moore's Lane lift station is also planned in FY 2025. Project is included City of Brentwood Fiscal Year 2025-2029 Page No 155 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update : https://www.brentwoodtn.gov/home/showpublisheddocument/7145/638288510944100000 This project provides for an on-going, proactive program to rehabilitate the City's sewer lift stations including operating equipment that provides alternative pumping methods during an emergency. To date, nine of the ten older stations have been rehabilitated within the last ten years with one station remaining. Two other stations have been added to the system in the last five years that will not need rehabilitation for some time. Project is included City of Brentwood FY 2024-2029 Page No 155 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ This project provides for an on-going, proactive program to rehabilitate the City's sewer lift stations including operating equipment that provides alternative pumping methods during an emergency. To date, nine of the ten older stations have been rehabilitated within the last ten years with one station remaining. Two other stations have been added in the last five years that will not need rehabilitation for some time. FY-2022-2027 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,500,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
75
Bidding Soon
1,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

To Be Determined, Brentwood, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.