Site work for a water / sewer project in Brentwood, Tennessee. Conceptual plans call for site work for a water / sewer project.

This project addresses future water system improvements identified in the water capacity master plan necessary to increase system capacity to meet the demands of Brentwood's customers. Funding in FY 2025 included ongoing engineering work associated with the Wilson Pike water line upsizing project. This project includes upsizing approximately 3,300 feet of 12-inch water line to a 16-inch water line between Twin Springs Blvd. and Crockett Road. Funding in FY 2026 includes continued engineering and construction of this water line project at an estimated cost of ($2.85M). Also, included in this project scope is replacement of smaller diameter 4 inch and 8 inch water lines along Ellendale Drive and Boone's Trail Circle. FY 2025 also included funding for ongoing engineering and initial construction of the Ragsdale Road water line extension, which coincides with the City's road widening project. A 12-inch water line is now being installed from Split Log Road to near Reflection Lane to provide water service aong this corridor. FY 2026 funding provides for the continued construction.. Beginning in FY 2028, funds are programmed to begin engineering and land acquisition of the Alamo Road area water line connector. This project proposes to install approximately 8,000 feet of 12-inch water pipe between the Mallory Park area and the Primm Farm development located on Moore's Lane, just west of Wilson Pike. This project connects two previously installed 12-inch water lines identified in the department's Water System Master Plan to provide increased capacity to the southeast service area (Split Log Road corridor). The project is included in the City's 2026 - 2030 Capital Improvement Program (CIP). As of October 27, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$8,820,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
1
Bidding Soon
653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.