BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work and addition to an educational facility in Eldon, Missouri. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

A certified or cashiers check or bid bond, executed by the bidder and an approved Surety Company, in the amount of five percent (5%) of the bid shall be submitted with each bid. The Contractor shall not pay less than the current prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations. Payroll records will be required from the Contractor by the School District. Technical questions regarding the Contract Documents can be emailed to lbackstrom@thearchitectsalliance.com or faxed to The Architects Alliance, Inc. at (573) 636--6133. All General Contractors planning to submit a bid as a prime contractor are required to attend the Pre-Bid Meeting. The Owner reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of bids. Likewise, the Owner reserves the right to select the lowest and best bid which is in the best interest of the Owner The project is expected to include a single-story, 7,600 square foot addition to the northwest corner of the South Elementary School building, and a single-story, 9,660 square foot addition to the north side of the Upper Elementary School building. Site improvements are expected to include two additional parking lots with one located on S. Maple St., north of the school, and one located on E. 15th St., east of the school. Although the grading plan has not been completed, preliminary concepts indicate the finished floor elevation is anticipated to be near existing grade. Isolated column loads are not expected to exceed 10 kips and wall loads are not expected to exceed 3,000 pounds per lineal foot (plf).

Post-Bid

Educational

$2,000,000.00

Public - City

Addition, Demolition, Site Work

59

24

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
26
Bidding Soon
332
All Active Projects
133
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 9, 2023

img_map_placeholder

Multiple Locations, Eldon, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.