Site work and paving for a mixed-use development in Geneva, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of June 13, 2023, project was awarded to Geneva Construction Company, and the awarded amount is $2,545,587.73.** Proposals submitted after the time specified will be returned to the bidder unopened. Bids that are not complete will not be read out loud after opening and will be returned. The 2023 STREET IMPROVEMENTS include resurfacing of twenty (24) four different City streets for combined length of five point (5.1) one miles using WMA. There will be spot removal & replacement of curb & sidewalk, pavement patching, removal of trip hazards from, and the removal & replacement of inlets and manholes. The parkway shall be restored with topsoil, seed, mulch and fertilizer. There shall also be pavement marking also. Bidders Instructions Bidders shall submit two (2) complete copies of their Bids. All proposals shall be accompanied by a proposal guaranty equaling an amount not less than 5% of the bid amount. This guaranty may be in the form of a Bid Bond or cashiers check made out to the City of Geneva with the name of the project clearly written in the notes. The City of Geneva, Illinois reserves the right to reject any or all bids and waive technicalities. The quantities appearing in the summary of quantities are approximate and are prepared for comparison of bids. Payment to the Contractors will be made only for in place quantities and for work completed & accepted and/or for materials furnished and used according to the contract. The scheduled quantities of work to be done and materials to be furnished may be increased, decreased or omitted as hereinafter provided. Submission of a bid is conclusive assurance and warranty that the bidder has examined the plans, specifications, visited the site and understands all requirements for the performance of the work. The bidder shall be responsible for all errors and omissions in their bid package including those resulting from failure or neglect to conduct an in-depth examination of the site, the plans and the specifications. In no case will the City be responsible for any cost, expenses, losses or changes in anticipated profits resulting from any errors and omissions. The bidder shall not take advantage of any errors or omissions in the bid documents. Bidders may withdraw their proposal providing the bidder makes a request to withdraw their proposal in writing or in person before the scheduled time of the bid opening. All employees and suppliers working on this project shall be paid no less than the prevailing wage determined by the Illinois Department of Labor at the time of the bid opening or as adjusted thereafter. The Contractor shall certify that he/she is not in violation of, nor has been convicted, for a violation of the Illinois Public Construction Act.

Award

Roads / Highways

$2,545,588.00

Public - City

Paving, Site Work

56

6

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Temporary Construction, Temporary Ramps, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
141
Bidding Soon
2,365
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2023

June 9, 2023

img_map_placeholder

Multiple Locations, Geneva, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Street Improvements program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.