Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 5, 2026 at 7:00 PM
Updated February 6, 2026
Site work and new construction of a fire / police facility in San Diego, California. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
The Police Department serves all communities throughout the City through nine patrol division facilities, a Police Plaza, a Traffic Division, and a Headquarters downtown. The Police Department has four new facility projects planned during this CIP Outlook, including Police Plaza tenant improvements, an Academy building, a Firearms Training Facility, and a Northern Division facility. All other projects for existing police stations are captured under the Existing Facilities – General Fund needs section of this report, including security fencing for the Southeastern Division facility, parking lot poles and lighting improvements for nine Divisions and Air Support, and concrete pavement replacement for the Northern Division parking lot. The Department took custody of Police Plaza (previously the Chargers Training Facility), planning to remodel it to allow several decentralized Police Units to be in one centralized location. These units include the Neighborhood Policing Division, Traffic Division, SWAT Unit, Training Division, Early Identification and Intervention System, Wellness, Canine, Child Care facility, Operational Support, and others. Several Units are already at this location. The facility needs to be redesigned for more efficient use of its square footage, as it is still configured as a professional football training facility. A feasibility study for this was completed in 2021, and needs are shown in the outlook period for the design and construction of the improvements. This location also needs an Academy building to include design and construction to accommodate all police training recruits. The Home Avenue firearms range was decommissioned. This was the site where personnel for the Department completed all firearms training. With the loss of the Home Avenue firearms range, the Department needs a new firearms training facility to meet all the qualifications and State-mandated training. Needs are for feasibility study and design, projected early and construction projected later in the CIP Outlook period for this project. In addition, funding is needed for the feasibility study, land acquisition, design, site improvements, and construction of the Police Northern Division. Northern Division is the oldest of the patrol buildings, which initially opened in 1968. The current Northern Division building faces numerous challenges as personnel and technology have evolved. As an example, the building is constructed of hardened concrete walls and metal interior partition walls that inhibit Wi-Fi capability. The current wiring and data ports have been maximized, and the opportunity for further technological and data expansion capabilities has diminished. A new facility is needed within the outlook period. Project is included in the City of San Diego's FY 2025-2029 Capital Budget. As of February 5, 2026, information including a design team and a general contractor is not available. Funding is anticipated in FY 2025, FY 2026 and FY 2029.*
Conceptual
Fire / Police
$151,663,232.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2029
Multiple Locations, San Diego, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
