BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Santa Cruz, California. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

***As of July 13, 2023. The owner has selected a Construction Manager. A timeline for construction has not yet been established.” The purpose of this Request for Proposal (RFP) is to provide interested parties with sufficient information regarding the construction management services the City of Santa Cruz Department of Public Works (City) is seeking for the Murray Street Bridge Seismic Retrofit and Barrier Replacement Project (Project). This information is intended to enable interested parties to prepare and submit proposals for a construction management and resident engineer team to manage the construction of this Project. The proposed scope is to provide construction management and resident engineer services to manage a Federal Bridge Program contract. The construction management and resident engineer team will manage the contract following Federal construction engineering guidelines and procedures, as administered by Caltrans, including the Local Assistance Procedure Manual and the Construction Manual. The construction contract will include provisions to provide a jobsite trailer (or suitable office space) for the construction management team and provide electricity, phone, internet, water, and sanitation services. The Project is planned to begin construction in 2023 and has an anticipated duration of 30 months. The Project generally involves installation of piles, foundation work on driven piles, deck widening, barrier replacement, construction staging, traffic control, signing, paving, striping, and utility coordination. In addition, a sanitary sewer force main will be constructed on the bridge. The Federal lead agency for the Project is the Federal Highway Administration with oversight from the California Department of Transportation (Caltrans) District 5 Division of Local Assistance. The Project shall fully comply with Chapter 6 of the Local Assistance Programs Guidelines (LAPG) and the entire Local Assistance Procedures Manual (LAPM).

Pre-Construction/Negotiated

Bridges / Tunnels

$200,000.00

Public - City

Paving, Site Work

3

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
38
Bidding Soon
1,253
All Active Projects
538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2023

July 14, 2023

img_map_placeholder

Multiple Locations, Santa Cruz, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.