Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Genesee, Michigan. Completed plans call for the renovation of a educational facility.

This work will be a prime bid with the low bidder being responsible for the full scope of work. Construction Timeline The Design work for this project will need to begin as soon as a contract executed, and the installation of the Studio Set is projected to happen in December 2023. Questions regarding the bid or contract documents shall be directed to: bids@dccconstruction.com DCC Construction, Inc. 10266 Lapeer Rd. Davison, MI 48423

Post-Bid

Educational

$160,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
125
Bidding Soon
2,343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 9, 2023

Project location map

Multiple Locations, Genesee, MI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed