BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of an educational facility in Oxford, Ohio. Design plans call for the renovation of a educational facility.

As of June 3, 2024, an architect has been selected and this project is in the early design phase. It is anticipated bidding will commence in February 2025, with construction starting April 2026. *The closed solicitation has been included below for reference: Miami University is soliciting qualification for professional engineering services. Miami University would like to replace their glycol system in Goggin Ice Arena which is utilized to produce and maintain ice in both Pad A and Pad B within the facility. The components in this system are nearing the end of their expected life, and this system also utilizes a refrigerant which is being phased out of production (R-22). This project is intended to replace the old glycol system in the building with a new system utilizing plate and frame heat exchangers - one dedicated to Pad A and the other dedicated to Pad B, with the ability to serve both of the ice pads from either of the heat exchangers, providing the system with another level of redundancy, and the option to operate the two ice pads at different temperatures. The cooling towers which support this system are at the end of life, as are the PCU controllers, and both of these components should be replaced. The compressors in the system are due for maintenance, and should be evaluated for rebuild or replacement. In addition to the replacement of the glycol system we would like to increase the size of the electric boiler that is currently being used to preheat the water used by our Zamboni, as the current equipment is not able to produce water to the desired temperature (140 F min). This facility has minimal scheduled downtime, so careful coordination of the construction scope and early procurement of equipment will be necessary to ensure this construction work is able to be completed without risking the facility's schedule.

Design

Educational

$1,250,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
81
Bidding Soon
1,036
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

img_map_placeholder

501 E High St, Oxford, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.