Published September 8, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Colorado Springs, Colorado. Completed plans call for the renovation of a educational facility.

Colorado Springs School District 11 is requesting proposals from Contractors to replace the HVAC system at Jenkins Middle School. Questions Due Date: May 1st 2023, 12:00 PM MDT B.1 GENERAL The following is presented to describe the general expected vendor performance requirements. Offerors must submit how and when they are capable of supplying the required products and services and completing the work within the required time. Offerors are free to suggest other product(s) brands and models, work service procedures, or project approaches, designs, or exceptions to this general scope of work. Those exceptions must be clearly (bold, underlined, etc.) indicated in your offer. If an Offeror cannot perform as described or takes exception to any element, those exceptions must be fully described in their Offer and an alternate plan or approach presented. Award will not be based on price alone. Clean-Up Contractor shall keep the premises free from accumulation of debris, surplus material, waste material, dirt piles and rubbish caused by the work. Contractor shall perform clean-up daily and transport rubbish to an on-site location designated by Contractor. Contractor is responsible for containment and removal. The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any surplus materials that are not the property of the District. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer and shall remove surplus material, waste material, and dirt and rubbish, tools, equipment and scaffolding. A. Final Clean-Up: 1. Exterior: In addition to items specified below, all surfaces on exterior, concrete, metal, etc., affected by the work shall be carefully and thoroughly cleaned. 2. Glass: Both sides of all glass affected by the work shall be carefully and thoroughly cleaned by professional window cleaners and left absolutely clean and free from paint, labels, grease, dirt, etc. 3. Hardware: Clean and polish all hardware affected by the work and leave cleanand free from paint, grease, dirt, etc. 4. Equipment: Carefully and thoroughly clean all items or equipment, mechanical, electrical, cabinets, ductwork, etc., which have been affected by the work. B. All work areas within the area of responsibility shall be left in clean condition before being accepted by the District. The Contractor shall be required to clean only those areas which are affected by the work. It is anticipated that this will be limited to the work areas indicated on the plans, areas adjacent to the work areas which are affected by the work, the areas on the site where the Contractor's trailer(s) are located, and any other interior or exterior areas which have been dirtied or damaged by the Contractor's operations under this contract. C. Any damage caused by the Contractor shall be accomplished within the period of performance of the Contract. No extension of time will be granted to completerepair

Award

Educational

$4,397,670.00

Public - City

Renovation

125

15

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
40
Bidding Soon
649
All Active Projects
324
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

August 1, 2024

img_map_placeholder

6410 Austin Bluffs Pkwy, Colorado Springs, CO

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jenkins MS HVAC Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.