BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Okatie, South Carolina. Contact the soliciting agency for additional information.

As of February 22, 2024, this project was cancelled on June 27, 2023. The Beaufort-Jasper Water & Sewer Authority (BJWSA) has decided to seek a Program Management Contract for installation of a public, vacuum sewer system in the Stoney Creek area of the May River Watershed illustrated in Exhibit 1. The installation of vacuum sewer system is necessary to improve the water quality of the May River by reducing the amount of septic sewer service in the watershed. The purpose of this Request of Proposals (RFP) by BJWSA is to solicit proposals from engineering consulting firms to provide Program Management services including design, permitting, bidding assistance, construction phase services, and project closeout for the May River Watershed Sewer Master Plan Stoney Creek Vacuum Sewer. BJWSA will select the best qualified firm from the submitted proposals based upon selection criteria as provided herein. One of the recommended projects was identified as the Stoney Creek Vacuum Sewer project as shown in Exhibit 1 Successful completion of this project will enable the Stoney Creek vicinity to be served by a public sewer system that delivers collected sewage to the Cherry Point Water Reclamation Facility (CPWRF) thus reducing the usage of septic systems and improving surface water quality. Funding for this project will be split three ways between the County, the Town and BJWSA. In September 2022 a South Carolina Infrastructure Improvement Program (SCIIP) grant application was submitted to SC Rural Infrastructure Authority (SC RIA) to aid funding for this project. If awarded, the grant would help fund 75% of the project cost and be subject to federal procurement guidelines BJWSA seeks to select a firm to implement the Stoney Creek Vacuum Sewer Project in a timely manner. The SCIIP grant application projected the major milestone completion dates required to achieve the funds committed date first quarter of 2023 and funds expended date of December 31, 2026. That schedule is as follows: Final Design by 3/31/2024 Permits acquired by 6/30/2024 Right-of-way/Easement acquisition by 6/30/2024 Construction solicitation/advertise for bids by 9/1/2024 Construction start by 7/1/2025 Exhibit 1 provides an overall view of the project area while Exhibit 2 shows a conceptual layout. The project includes, but is not limited to, the design and construction of approximately 32,000 feet of vacuum main, 3,000 feet of service laterals, 6,750 feet of 8" force main and one vacuum station. The Considerations for Design estimate that approximately 150 lots will be impacted. Questions Due Date: Mar 30th 2023, 4:00 PM EDT

Project Abandoned

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
42
Bidding Soon
523
All Active Projects
245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

img_map_placeholder

To Be Determined, Okatie, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.