BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Foley, Alabama. Completed plans call for site work for a water / sewer project.

As of May 24 the project was awarded to James Bros Excavating Inc for $546,642.50 . The scope of work consists principally of removing approximately 1,055 LF of 40x56 CMP and existing structures; installation of 545 LF of 51.1"x31.3" RCAP; 539 LF of 58.5"x36" RCAP; yard inlets; headwalls; grading; stabilization; and related appurtenances. A total of 45 working days will be allowed for this project. The City of Foley reserves the right to accept or reject any or all bids and to waive technical errors if, in the City's judgment, the best interests of the City will thereby be promoted.

Award

Water / Sewer

$546,643.00

Public - City

Site Work

9

3

6

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
62
Bidding Soon
724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

June 15, 2023

Project location map

Co Rd 12, Foley, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.