BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Waukesha, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The project is located at three separate locations within the City of Waukesha. N. Greenfield Avenue work is from Lincoln to Linden, Center Road is from Corporate to River Hill, and Hillcrest Loop is located at our Hillcrest Reservoir off of E. Main Street. Work will include water main, pavement milling, areas of curb & gutter and sidewalk, traffic control, erosion control, and roadway paving. The Contractor shall perform all Work required and shall provide and furnish all the labor, materials and necessary tools, expendable equipment and all utility and transportation services required for the completion of the Greenfield Ave, Center Road, and Hillcrest Reservoir Improvements, all in strict accordance with the Contract Documents, including but not limited to the Project Plans and Specifications, and including all Addenda, if any, prepared by the Owner, and in strict accordance with the Contractor's Bid Proposal dated May 12, 2023, and all other Contract Documents, which, together with the Project Plans and Specifications are made a part of this Contract.

Award

Sidewalks / Parking Lot

$535,455.00

Public - City

Paving, Site Work

12

3

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
205
Bidding Soon
2,262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2023

July 10, 2023

Project location map

Multiple Locations, Waukesha, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.