BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2025 at 7:00 PM

Updated June 24, 2025

Site work and paving for a road / highway in Waukesha, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of January 9, 2024, a design firm has been selected. At this time, construction is not expected until 2027. The Waukesha County Department of Public Works ("the Sponsor") is interested in obtaining the services of an engineering/design consulting firm ("the Consultant") for the facility development process. The process will result in the design and preparation of preliminary and final plans, PS&E documents, and reports, for the pavement replacement and geometric redesign of approximately 0.2 miles of Pewaukee Road (CTH J) and 0.2 miles of CTH FT (Northview Road) in the City of Waukesha ("the Project"). A Request for Qualifications (RFQ) from the engineering/design firm will be reviewed in order to evaluate, rank and select a firm for the services for the Project located in the City of Waukesha, Waukesha County. Questions Due Date: Jun 13th 2023, 10:00 AM CDT Intent to Bid Due Date: Jun 27th 2023, 2:00 PM CDT This segment of CTH J is a vital commuter link to the I-94 corridor as well as the local businesses and municipalities. The project will provide positively offset left-turn lanes in the northbound and southbound directions to improve driver visibility of opposing traffic. Improvements may include: replacing the existing pavement, reconfiguring intersections to improve safety, replacing older traffic signal equipment, minor grading, median installation, storm sewer improvements. Access to businesses will be required to be maintained during construction. As part of the design, the pavement replacement as well as lane geometrics shall be evaluated to accommodate current and future traffic requirements and volumes. This project requires survey, the development of preliminary and final plans, environmental review and all reports required and outlined within the contract documents, including all reports and work necessary to complete the P.S.& E. documents for the construction of this Pewaukee Road project.

Design

Roads / Highways

$2,000,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
208
Bidding Soon
2,275
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Northview Rd & Pewaukee Rd, Waukesha, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.