BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Pueblo, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

In general, this project will consist of asphalt road improvements on Starlite Drive between Bridle Trail and the City Limits (Little Burnt Mill Road) within Pueblo, Colorado, as detailed in the plans and specifications for this project. Contractor must be capable of, and shall be required to, self-perform at least thirty percent (30%) of the actual labor or trade work (not supervision) required to complete the project. By submitting a bid, Contractor certifies that Contractor's own employees shall be utilized to meet the self-performance requirement. Supervision of subcontractors is not considered self-performance. Failure to meet this requirement may result in the bid being deemed non-responsive. Documented confirmation that Contractor is meeting this requirement during the performance of the work will be required Asphalt shall be removed to the lines and grades established by the Project Manager. Any removal outside those lines and grades not approved by the Project Manager, will not be paid for by the City. Contractor shall properly dispose of all removed items from the construction site. Saw cutting to remove asphalt to a neat line shall not be paid for separately but shall be included in the cost of the asphalt removal bid item. This bid item shall include all costs necessary to complete the asphalt paving work in accordance with the project plans and specifications. It shall include preparation of paving area, furnishing and placing the asphalt paving material and any items incidental to the proper completion of the work. Asphalt paving material shall be Grading SX conforming to the applicable Colorado Department of Transportation (CDOT), Standard Specifications for Road and Bridge Construction, most current Edition, Section 702 and Section 703. The City will allow up to a maximum of Thirty (30) percent of Reclaimed Asphalt Pavement (RAP) in the asphalt mix design. Asphalt cement binder shall be PG 64-22. The Contractor shall submit a Job Mix Formula JMF) for the HMA asphalt to be used on this project. Failure to complete the work by the allotted 90 calendar days shall result in the assessing of liquidated damages according to General Provisions. Question Submission Deadline: May 5, 2023, 12:00pm

Award

Roads / Highways

$272,853.00

Public - City

Paving, Site Work

7

6

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
10
Bidding Soon
206
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 12, 2023

img_map_placeholder

Starlite Dr, Pueblo, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.