BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2023 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a water / sewer project in Valley Brook, Oklahoma. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project includes site preparation, concrete foundation, and one (1) standpipe. Installation of valves and waterlines, fencing, and all necessary appurtenances. No documents will be mailed until payment is received in full. Contact Michael Taylor with any questions. South of SE 59th Street along 61st Street between Camille Avenue & Cox Avenue. Questions regarding documents, discrepancies, omissions, or intent of the specifications or drawings shall be submitted in writing to the Owner through the Engineer at least seven (7) days prior to opening of bids to provide time for issuing and forwarding an addendum Question Deadline 05/17/2023 The work covered by these specifications and drawings shall consist of all materials, transportation costs, equipment, and tools that are related to, or are to be incorporated in this contract and must be received, unloaded, stored, installed, erected, service connections provided, and coordinated with the construction by the CONTRACTOR under this contract. Installation of equipment and materials shall mean furnishing of all labor and materials as required to place the improvements in successful operation. The CONTRACTOR shall be responsible for all equipment and materials and shall replace at his own expense all such equipment and materials found defective in manufacture or damaged in handling after delivery by the manufacturer. The improvements are as listed: OKLAHOMA COUNTY UTILITY SERVICE AUTHORITY (OCUSA) WATER TOWER B. This contract shall include minor items not specifically mentioned herein but shown on the accompanying plans or obviously necessary to provide a complete job. C. The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Completion of earthwork. 2. Construction of concrete foundation. 3. Installation of valves and waterline, and all necessary appurtenances. 4. Installation of one (1) standpipe. 5. Installation of fencing. Note: Temporary pumping, piping, plugs, shut offs, etc. shall be considered incidental and included in the cost of other bid items. D. The price named in the Proposal shall include the furnishing of all labor, material, transportation costs, equipment rental, etc., necessary to construct the project as herein specified and as shown on the accompanying plans. E. The CONTRACTOR shall cooperate with the OWNER during construction so as to place the improvements in operation at minimum inconvenience and without significant disruption of the OWNER. The CONTRACTOR shall minimize his area of operation. Any areas disturbed will be restored to the OWNER'S satisfaction.

Bid Results

Water / Sewer

$680,921.00

Public - County

Renovation, Site Work

21

14

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
67
Bidding Soon
901
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

June 23, 2023

Project location map

To Be Determined, Valley Brook, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.