BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2023 at 8:00 PM

Updated August 8, 2024

Site work, paving and outdoor lighting for a mixed-use development in Whittier, California. Working plans call civil work for a road / highway, sidewalk / parking lot and water / sewer project.

**As of June 16, 2023, no bids received. No definite date for the rebid.** The Project limits reside within both the City of Whittier and Caltrans right-of-way. Contractor is required to pull permits from Caltrans, Los Angeles County Public Works, the City of Whittier Public Works Department (no-fee permit), and the City of Whittier Building Department (no-fee permit). The Project will include re-alignment of Whittier Boulevard, reconstruction of curb ramps, passageways, driveways, and sidewalks adhering to Americans with Disability Act (ADA) standards, median reconstruction, street widening, drainage modifications, asphalt concrete pavement, installation of a retaining wall between the Greenway Trail Pedestrian overcrossing and bridge abutment to allow improved line-of-sight, traffic signal modifications, street lighting modifications, and signing and striping at the intersection.

Final Planning

Roads / Highways

$3,500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

134

8

134

2

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
2
Bidding Soon
1,972
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

December 15, 2023

Project location map

Whittier Blvd & Santa Fe Springs Rd, Whittier, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.