BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Seaside, Oregon. Completed plans call for site work for a water / sewer project.

Estimated project cost range: $585,000 - $785,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work consists of supplying all labor, tools, equipment, and materials, not included any materials previously purchased and provided for the project, necessary to remove and construct a new structure on Wahanna Road, and includes, but is not limited to, the following work elements (see details in Description of Project Section): i Fish Salvage and Work Isolation i Site preparation and Subgrade Footing Placement (incl natural substrate) i Install Channel Spanning Structure,Utilities Relocation, and Road Resurfacing i Site rehabilitation, large wood placement, and native planting i New utility water main and sewer installation** Complete all work to be done under the contract no later than September 15st, 2023. The project is a collaboration between the Necanicum Watershed Council and the City of Seaside. Funds have been secured from the Oregon Watershed Enhancement Board, City of Seaside, Oregon Department of Fish and Wildlife, and Pacific Lamprey Conservation Initiative to leverage the successful completion of this project. The Lower Coho Creek Fish Passage goal is to restore full volitional access to 1.4 miles of spawning and rearing habitat needs of local fish populations through the removal of two undersized culverts and associated berm structures currently supporting City of Seaside utilities. This project represents the final barrier for this system to re-establish habitat connectivty to a tributary of Neawanna Estuary in the Necanicum River watershed. The is positioned in critical transition area adjacent to head of tide and funtioning marsh plain habitat. The project proposes to replace the existing undersized culverts crossing under Wahanna Road with a 19' open bottom, multiplate arch with natural stream simulation substrate that meets state and federal fish passage criteria.

Award

Water / Sewer

$464,150.00

Public - City

Site Work

16

9

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
29
Bidding Soon
564
All Active Projects
276
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2023

June 12, 2023

img_map_placeholder

To Be Determined, Seaside, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.