BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 12, 2025

Renovation of a transportation facility in Memphis, Tennessee. Design plans call for the renovation of a transportation facility.

https://www.bizjournals.com/memphis/news/2025/06/02/mem-airport-construction-to-affect-passengers.html Memphis International Airport (MEM) is undergoing a significant modernization under its Terminal Modernization and Seismic Program (TMSP), which is the largest capital project in the airport's history. The project, estimated at over $650 million, commenced in 2024 and is projected to conclude in 2030. _____________________________________________________________________________________ https://www.bizjournals.com/memphis/news/2025/03/20/memphis-airport-approves-modernization-design.html The Memphis-Shelby County Airport Authority (MSCAA) has moved forward the design for the airport's terminal modernization and seismic program (TMSP). MSCAA unanimously passed a resolution at its March 20 board meeting to approve Memphis International Airport's latest TMSP design amendment. The current amendment is valued at $25.88 million to complete design development and construction documents for the TMSP project. Architectural, civil, structural, electrical, mechanical, and plumbing engineering documents would come out of that design work. Before the new amendment, the board had approved about $32 million in contract and contingency expenditures on the project. That included 10% of the entire TMSP; design of the administration building, checked baggage inspection system, and outer-upper roadway; schematic design level for Terminal B's modernization, and assessment of the airport's transit tunnel. The contract amount ($56.71 million) and expenditure contingency equal $59.21 million for the currently approved TMSP design work. The project is expected to begin in 2027 following the completion of the outer-drive replacement project, the airport said. The designs presented at the board meeting (see below) are conceptual and might look slightly different once the TMSP project is completed. MSCAA president and CEO Terry Blue said the entire terminal modernization's cost is projected at $700 million. The design team is spearheaded by Memphis-based UrbanArch and Minneapolis-based Alliiance Architects. Other groups part of the team include HOK, CMTA, Kimley-Horn, Vic Thompson Co., Connico, and Faith Group. "It really does take a complete team to make sure that you cover every aspect of the project as complex as our terminal modernization and seismic program," Blue said. ________________________________________________________________ As of March 25, 2025 the project is in design phase. Memphis-Shelby County Airport Authority board approved conceptual design on March 20, 2025. The architects and construction manager has been chosen. Information regarding subcontractors opportunities have not been disclosed. Construction is expected to begin in 2027.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. The original solicitation follows below. _______________________________________________________________________________________________ PROJECT DESCRIPTION Phase 1A will comprise enabling work for the Terminal Modernization such as upgrades to the central energy plant's mechanical, electrical, and plumbing systems, and upgrades to vertical transportation. RFP PACKAGES Vertical Circulation (Elevators and Escalators) Plumbing Mechanical Electrical CEP Equipment Pre-purchase ANTICIPATED PROCUREMENT PERIOD Dates below are subject to change All proposing companies must be prequalified at time of proposal Submission. IF INTERESTED, EMAIL: Khalif Johnson, TAC - Procurement Manager kajohnson@tcco.com

Design

Transportation Terminals

$655,000,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
33
Bidding Soon
661
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

April 19, 2027

Project location map

2491 Winchester Rd, Memphis, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.