BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Stillman Valley, Illinois. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

This project involves removing existing metal culvert (69" x 54") and adding two concrete pipe culverts (42" EQRS), drop box (15' x 8'), concrete flared end sections, storm sewer, drain tile, storm manhole, storm inlets, riprap, and all necessary restoration work. C.H. 4 (Stillman Road)

Bid Results

Bridges / Tunnels

$109,397.00

Public - County

Site Work

40

3

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
277
Bidding Soon
3,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2023

July 4, 2023

Project location map

N Stillman Rd, Stillman Valley, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.