Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a library in Stillman Valley, Illinois. Completed plans call for the renovation of a 8,368-square-foot, one-story above grade library.

Finishes replacement including painting, flooring replacement and millwork including miscellaneous electrical and plumbing. Summary Project Description: Bid Package A: Flooring finishes replacement, painting, millwork, miscellaneous plumbing and electrical including associated moving and reinstallation of existing FF&E. Bid Package B: reupholstery of existing seating.. Contract Scope: demolition, renovation, and work as described in contract drawings Direct questions to Erin O'Keefe, project architect, Studio GWA, email; eokeefe@studiogwa.com. B. Addenda may be issued during the bidding period. All Addenda become part of Contract Documents. Include resultant costs in the Bid Amount. C. Clarifications requested by bidders must be in writing not less than 3 working days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients and included in the electronic plan room. Question Deadline 06/02/2023 Last Request for Substitution Due: 3 working days prior to due date of bids. C. Last Request for Information Due: 3 working days prior to due date of bids.

Post-Bid

Library

$400,000.00

Public - City

Renovation

12

14

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 15, 2023

Project location map

100 Library Lane., Stillman Valley, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed