BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work and paving for a mixed-use development in Stillman Valley, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Stillman Valley - 2025 General Street Maintenance City: Stillman Valley County: Ogle State/Province: IL Site Directions: W. 1st Street east of Valley Drive and Hillcrest Street south of W. 1st Street Est. Value: $ 306,364.50 Est. Completion Date: Aug. 8, 2025 Mill existing Hot-Mix Asphalt pavement of variable thickness and aggregate base a total of three inches (3") on Hillcrest Street and four inches (4") on W. 1st Street, and replace with three inches (3") of Hot-Mix Asphalt Pavement on Hillcrest Street and four inches (4") of Hot-Mix Asphalt Pavement on W. 1st Street. Removal and replacement of sidewalk curb ramps with ADA compliant sidewalk, removal and replacement of concrete curb and gutter, removal and replacement of identified driveway aprons, manhole adjustment and inlet reconstruction. Project may include undercutting of existing sub-grade to be identified in the field for replacement with aggregate base course.

Award

Roads / Highways

$271,288.00

Public - City

Paving, Site Work

4

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
278
Bidding Soon
3,419
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

Project location map

Multiple Locations, Stillman Valley, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.