Renovation of a water / sewer project in Monticello, Iowa. Completed plans call for the renovation of a water / sewer project.

The Project includes the following Work: The Wastewater Treatment Plant Improvements project includes, but is not limited to, furnishing all labor, material and equipment necessary for construction and installation of: submersible pumps in the raw influent lift station, screening wash and compactor, replacing grit classifier equipment, cast-in place tanks for an activated sludge treatment system, various in tank equipment for the active sludge treatment system, non-contact ultraviolet disinfection system, precast effluent reuse lift station and submersible pumps, precast effluent pump station and submersible pumps, precast manholes, new precast controls building, rotary sludge dewatering press, precast building and storage area for sludge handling, non-potable water storage tank, non-potable water booster pump station, water main extension, non-potable water main, force main, gravity sewer main, aeration blowers, demolition of existing tanks and buildings, sludge removal, site work, paving, electrical, mechanical, plumbing and other miscellaneous items. A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10) percent of Bidder's maximum Bid price and in the form of a certified check or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Contract or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. The Work will be substantially completed within 915 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 975 calendar days after the date when the Contract Times commence to run. Contractor shall pay Owner $3,000.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $3,000.00 for each day that expires after such time until the Work is completed and ready for final payment. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently. To the extent allowed by Federal law and regulation, by virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa.

Award

Water / Sewer

$23,448,000.00

Public - City

Renovation

169

34

29

7

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
42
Bidding Soon
980
All Active Projects
316
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 24, 2023

December 25, 2023

August 26, 2026

img_map_placeholder

1105 E 1st St, Monticello, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.