BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2024 at 7:00 PM

Updated December 6, 2024

Site work for a water / sewer project in Lake Hamilton, Florida. Completed plans call for site work for a water / sewer project.

The Town of Lake Hamilton, Florida, is soliciting bids to furnish all labor, materials, equipment, management, administration, supervision, insurance coverage, and any other facilities and services necessary to successfully construct, start-up, and warranty the completed Project (Town of Lake Hamilton Wastewater Treatment Facility Phase 2). The Project is generally described as a wastewater treatment facility expansion including construction of an elevated headworks and grit removal system, surge tank, and precast concrete treatment train. The purpose of this meeting is to review the scope of work and completion schedule for this Project, to answer questions, and to ensure that there is a clear understanding of the work that must be performed and completion deadlines to successfully complete this entire project. All bid questions must be received prior to Wednesday, July 29, 2024, at 5:00 pm local time to eoviol@pennoni.com to be answered. The Town reserves the right to waive any informalities or minor irregularities; reject any and all bids which are incomplete, conditional, obscure, or which contain additions not allowed for; accept or reject any bids in whole or in part with or without cause; and accept the bid which best serves the interests of the Town. Pursuant to the requirements of Section 287, Florida Statutes, all qualifiers are subject to those provisions pertaining to Public Entity Crimes and the Convicted Vendor List. Further, pursuant to federal law the Owner may not award this contract to any bidder which is debarred or suspended or is otherwise excluded from or ineligible for participation in federal assistance programs under Executive Order 12549, Debarment and Suspension. Engineer's estimate - $6,309,701 WBE (6.9%)

Award

Water / Sewer

$8,586,600.00

Public - City

Site Work

61

27

63

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
168
Bidding Soon
2,870
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

December 10, 2024

Project location map

To Be Determined, Lake Hamilton, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.