BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Addition to a water / sewer project in Montross, Virginia. Completed plans call for the addition of a water / sewer project.

Bid s for construction of new sludge drying beds in Coles Point Wastewater Treatment Plan (WWTP) at Westmoreland County, VA All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding Oral and other interpretations or clarifications will be without legal effect. 7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer. The intent and meaning of the Contract Documents require that the Contractor, under the terms of his contract, shall take such action as necessary and required to provide labor, plant, materials, equipment, transportation, facilities, and appurtenances thereto, which are indicated or reasonably implied by each Drawing and each section of the Specifications, all of which are collectively necessary and required for the execution of the Work. B. Description of Work at Property as shown on the plans: The Contractor shall furnish all materials, labor, and supervision to perform services described in Contract Documents to complete the following work: 1. Piping from existing drying beds to new drying beds as shown on the drawings. 2. Construction of new sludge drying beds as shown in the drawings 3. Install weather protection as shown in the drawings. 4. Install drying bed media/panels as per drawings and manufacturer's manual. 5. Testing and inspection 6. Piping from drying beds to existing drain lift stations as per drawings Batch quantities of sludge, mixed with polyelectrolyte (polymer), are directed over the drying beds. Immediate separation of water drains through the filter bed media. Dried sludge is collected off the media.

Post-Bid

Water / Sewer

Public - City

Addition

11

12

3

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
57
Bidding Soon
1,818
All Active Projects
744
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2023

June 19, 2023

img_map_placeholder

111 Polk St, Montross, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.