BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Montreal, Quebec. Completed plans call for the renovation of a conference / convention center.

Reference number : 1718965 Deadline for receipt of complaints: 2023-05-09 Submission sent electronically accepted: Yes, in a single submission document The Work consists of replacement work on removable partition systems on a frame in room 516 of the Palais des congrès de Montréal. The Works include the supply of goods and services relating thereto, all as more fully described in the plans and specifications prepared by the architectural firm Atelier TAG et NEUF and the annexes which accompany them, all in accordance with the standards of the PUBLIC BODY, to the standards in force, to the rules of the art and to the requirements contained in these Tender Documents. An information session and site visit is scheduled for May 05, 2023 at 1:00 p.m. at the Société du Palais des congrès de Montréal. The meeting point will be in front of the Security Operations Center, ground floor 159 rue Saint-Antoine Ouest, in the city of Montreal, province of Quebec, H2Z 1X7. The Palais des congrès de Montréal will remain in operation during the Works. The CONTRACTOR shall carry out the Works on the site during the night, Monday to Friday, between 11:00 p.m. and 7:30 a.m. Noisy Work, vibrations, odors and atmospheric contaminants must be limited to these time slots. No later than 10 days following the awarding of the Contract, the CONTRACTOR must organize the first site meeting with the PUBLIC BODY and must submit for approval a detailed schedule for the execution of all the Works respecting the contractual deadline. . Unless otherwise decided by the PARTIES in accordance with the Contract, the Works must be performed according to the following Schedule: Manufacture of removable partitions: completed by November 15, 2023 Beginning of the start of the Works: February 5, 2024 Date of receipt of the Works with reservations: no later than March 4, 2024 Date of receipt of the Works without reservation: no later than March 11, 2024 The CONTRACTOR's Works must be planned and carried out so that the PUBLIC BODY can accept the Works without reservation on all the areas identified in the plans and specifications no later than March 11, 2024. THE BODY PUBLIC will proceed to the unconditional acceptance of the Works according to the conditions The CONTRACTOR must store the removable partitions following their manufacture until the start date of the work, i.e. February 5, 2024, all in accordance with the standards of the PUBLIC BODY, the standards in force, the rules of the trade. and the requirements contained in these Tender Documents. When the partitions are finished, the CONTRACTOR must notify the architect and the PUBLIC BODY. Inspection and acceptance by the architect must be completed before November 15, 2023. Start Date: 02/05/2024 End Date: 05/02/2025

Award

Conference / Convention Centers

$551,800.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
108
Bidding Soon
1,600
All Active Projects
679
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2023

February 12, 2024

img_map_placeholder

159 Rue Saint-Antoine O, Montreal, QC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.