Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 9, 2024 at 7:00 PM

Updated January 27, 2024

Demolition, site work and new construction of a mixed-use development in Atlanta, Georgia. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

Project No: 23-005, 2104-001 22.004C, 22JS42A, 20210315 The Owner shall not consider late proposals. Scope of Services to provide General Contractor services for the construction of the Owners Construction Project at Chesnut Elementary School, Druid Hills Middle School, Laurel Ridge Elementary School and Woodridge Elementary School Major Building System Replacement as specified per the Proposal Documents. For purposes of utility work, the street address of the sites are: Chesnut Elementary School, 4576 N. Peachtree Road, Dunwoody, GA 30338 Druid Hills Middle School, 3100 Mount Olive Drive, Decatur, GA 30033 Laurel Ridge Middle School, 1215 Balsam Drive, Decatur, GA 30033 Woodridge Elementary School, 4120 Cedar Ridge Trail, Stone Mountain, GA 30083 Prospective bidders must provide the following information by 5:00 PM, EST on Wednesday, May 3, 2023 1. Individual Name and Title2. Company Name3.Telephone Number4. Email Address This information must be sent to dcsd-op-solicitation@dekalbschoolsga.org. A meeting link will be sent to all those providing the above information no later than 10:30 AM, EST on Thursday, May 4, 2023 Questions Due May 16, 2023 not later than 2:00 pm dcsd-op-bidquestion@dekalbschoolsga.org The Owner reserves the right to reject any or all proposals, and to waive technicalities and informalities. To provide General Contractor services for the construction of the Owner's Construction Project at Chesnut Elementary School, Druid Hills Middle School, Laurel Ridge Elementary, and Woodridge Elementary School as specified per the Proposal Documents. The elements of construction are as follows: The Contractor shall supply materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and other services and facilities necessary to complete the construction at the described facilities, including, but not limited to, incidental work described in the Contract Documents. Replacement of Plumbing Fixtures New Security Vestibule Address Accessibility Issues Meeting will be held via TEAMS. Please refer "Virtual Mandatory Pre-Proposal Conference" for instructions to receive meeting link.

Award

Educational

$250,000.00

Public - County

Demolition, New Construction, Site Work

271

89

6

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
166
Bidding Soon
2,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

September 1, 2023

Project location map

Multiple Locations, Atlanta, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed