BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a bridge / tunnel in Estes Park, Colorado. Completed plans call for site work for a bridge / tunnel; and for the demolition of a bridge / tunnel.

Reference Number 0000319038 The Town of Estes Park (TOEP) seeks proposals from qualified consulting firms to provide professional services to fulfill work awarded through a FEMA grant and the Colorado Division of Homeland Security & Emergency Management (DHSEM). The funded activities are a scoping project that aims to reduce the risk of repetitive flood damage to buildings insured by the National Flood Insurance Program (NFIP). Scoping is for a potential construction project to improve channel capacity along two rivers (Fall River and Big Thompson River) in the iconic downtown corridor of Estes Park. The scoping project includes consideration of bridge replacement at two Big Thompson River crossings (Riverside Drive and Rockwell Street). Question Deadline 05/18/2023 at 2:00 PM MT Questions are submitted online No Contact Information Jennifer Waters 970-577-3740 jwaters@estes.org Extents of the scoping project in Estes Park: - Fall River (Moraine Avenue to the confluence with the Big Thompson River); and - Big Thompson River (Rockwell St bridge to N Saint Vrain/US 36 bridge) All Project Scoping activities should result in either an improvement in the capability to identify appropriate mitigation projects or in the development of an application-ready mitigation project for FMA, BRIC, or another funding opportunity that will provide benefits to the NFIP. Potential Project Scoping activities eligible under BRIC include: - Undertaking activities that lead to development of project applications; - Scoping and developing hazard mitigation projects, including engineering design and feasibility studies; - Conducting meetings, outreach, and coordination with potential sub-applicants and community residents to identify potential future mitigation projects; and - Collecting data for benefit-cost analyses, environmental compliance, and other program requirements. The extents of the Scoping Project in Estes Park (Figure 2) are in the downtown district. The Fall River (Moraine Avenue to the confluence with the Big Thompson River) and the Big Thompson River (Rockwell St bridge to N Saint Vrain/US 36 bridge) flow through this corridor. Lining the rivers are businesses, residential spaces, accommodations, parking, infrastructure for transportation and utilities, and natural riparian zones. Hydrology and hydraulics analyses conducted for the Downtown Estes Loop (DEL) project now under construction indicate that bridges and river channels are not adequate to convey hazardous flood flows. To reduce damage and destruction to property, critical services, facilities, and infrastructure, the scoping project is expected to assess: - widening the Big Thompson River channel between the N Saint Vrain/US 36 bridge and the Rockwell Street bridge; - replacing the Riverside Drive bridge and Rockwell Street bridges; and - channel work on Fall River between confluence with Big Thompson River and the Moraine Avenue bridge.

Post-Bid

Bridges / Tunnels

$547,500.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
108
Bidding Soon
1,598
All Active Projects
652
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 6, 2023

July 12, 2023

November 18, 2024

img_map_placeholder

W Riverside Dr, Estes Park, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.